Similar Projects
Project Luna / 1111 Akron Way
New Construction, Infrastructure - 278,212 SF
Design
$33,000,000 CJ est. value
Forney, TX 75126

Lions Den Self Storage Phase 2
New Construction, Infrastructure - 23,200 SF
Design
$696,000 CJ est. value
Kaufman, TX 75142

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Kaufman County MUD No. 12 Construction of Elevated Storage Tank 2
New Construction, Infrastructure
Bidding
$349,000 CJ est. value
Post Oak Bend City, TX 75142

Forney High School Expansion and North Forney High School Expansion - Phase 2
Addition, Demolition, Infrastructure - 73,107 SF
Sub-Bidding
$65,000,000 CJ est. value
Forney, TX 75126

Forney ISD Ranch Road, Innovation Blvd, Ed Wilson Public Infrastructure
Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Forney, TX 75126

Grading Improvements for Eastland, Phases 1B and 1C
Infrastructure
Post-Bid
TX

Windmill Farms Walden Pond Water Line Extension
Infrastructure
Post-Bid
Forney, TX 75126

Windmill Farms Walden Pond Water Line Extension
Results
TX

18" Waterline along FM 2932
Infrastructure
Results
$3,521,903 est. value
Forney, TX

Forney Crossing
New Construction, Infrastructure - 78,500 SF
Construction
$14,000,000 CJ est. value
Forney, TX 75126

ClearWater Express Car Wash / Terrell
New Construction, Infrastructure - 6,725 SF
Pending Verification
$2,000,000 CJ est. value
Terrell, TX 75160

Business Park / Forney
New Construction, Infrastructure - 1,100,000 SF
Pending Verification
$46,000,000 CJ est. value
Forney, TX 75126

South Pointe Park at Kaufman Sports Village Addition
New Construction, Infrastructure - 147,100 SF
Design
$130,000,000 CJ est. value
Kaufman, TX 75142

Kaufman County Water Control and Improvement District No. 1 Northspur Mass Grading Phase 1
Infrastructure
Bidding
$1,800,000 CJ est. value
Kaufman, TX 75142

Last Updated 02/28/2023 10:02 PM
Project Title

The Master Utility Improvements for Kingsborough East

Physical Address View project details and contacts
City, State (County) Kaufman, TX 75142   (Kaufman County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $649,905 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed proposals are sought for: 1. The Paving Improvements for Kingsborough, Phase 1A 2. The Utility Improvements for Kingsborough, Phase 1A 3. The Master Utility Improvements for Kingsborough East Project Description(s) Kingsborough, Phase 1A Paving and Utility: Location: Talty ETJ, Kaufman County, Texas Scope of Work: 60 Lots 4,900 LF 12" Waterline 2,000 LF 8" Waterline 2,600 LF Sanitary Sewer 1,400 LF Storm Drain Outfall Structures & Drainage Channels 15,200 SY Concrete Placement 1,250 SY Asphalt Placement (Evans Road) It is anticipated that the same utility contractor will be awarded the Kingsborough, Phase 1A Utility Improvements contract and the Kingsborough East, Master Utility Improvements contract, which will be treated as one project with a concurrent construction schedule. The district reserves the right to award in this or in a different manner if it is most advantageous to the District and results in the best and most economical completion of the District's proposed facilities as defined by TWC 49.273. The Kingsborough, Phase 1A Paving Improvements contract will be awarded separately. LGI Homes - Texas, LLC. on behalf of Kaufman County Fresh Water Supply District No. 7A and JLM 717 Kaufman, L.P. on behalf of Kaufman County Fresh Water Supply District No. 7A reserves the right to reject any and all bids. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. (Texas Water Code 49.273) Separate bid securities in the form of bid bond or cashier's check payable to LGI Homes - Texas, LLC. on behalf of Kaufman County Fresh Water Supply District No. 7A and JLM 717 Kaufman, L.P. on behalf of Kaufman County Fresh Water Supply District No. 7A in an amount not less than five percent (5%) of the Bid submitted, must accompany each Bid. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and/or Contract and bidder/contractor agrees that the Contract can be terminated if the bidder/contractor knowingly or intentionally fails to comply with a requirement of that subchapter. Bidder/Contractor declares that it has not received from a governmental body a notice of noncompliance with a provision of Subchapter J, Chapter 552, Texas Government Code, or, if such notice has been received, bidder/contractor has taken adequate steps to ensure future compliance with such subchapter and has provided or upon request will provide documentation of same.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents