Similar Projects
Construction of Miscellaneous Sanitary Sewer Work
Term Contract
Post-Bid
Secaucus, NJ 07094

Burma Road Area Water System Improvements
Post-Bid
Jersey City, NJ 07305

Phase 3 and 4 Water Main Replacement
Results
Less than $5,736,549 est. value
Jersey City, NJ

Palisades Avenue Sewer Service Lateral Inspections
Results
Hoboken, NJ

Town-Wide Sewer Video Inspection
Post-Bid
Guttenberg, NJ 07093

Cook Street Water Main Relocation
Results
Jersey City, NJ

Sewer Maintenance and Rehabilitation 2019-2021
Term Contract
Post-Bid
North Bergen, NJ 07047

Sanitary Sewer Main Rehabilitation/Lining
Results
Jersey City, NJ 07305

Phase 1-2 Infrastructure Rehabilitation
Post-Bid
Jersey City, NJ 07305

Pipe Cleaning and Video Inspection Service
Results
Jersey City, NJ 07306

Combined Sewer-Miscellaneous Repair Biennial Manhole Piping Contract 2020-2022
Term Contract
Post-Bid
Hoboken, Union City, Weehawken, West New York, NJ

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Sewer Line Replacement at 220 Adams Street
Post-Bid
Hoboken, NJ 07030

2020 Hudson Avenue Sewer Extension
Results
Hoboken, NJ 07030

Water Meter Replacement Project
Post-Bid
Kearny, NJ 07032

Reported 02/05/2020 12:00 AM
Project Title

Phase V Sewer Rehabilitation and Water Main Replacement

Physical Address View project details and contacts
City, State (County) Jersey City, NJ 07305   (Hudson County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes The replacement of approximately 8,209 linear feet of existing sewer pipes, ranging from 12 to 24 inches in diameter up to 16 feet deep and 500 linear feet of existing sewer pipes, ranging from 30 to 48 inches in diameter between 10 through 17 feet deep, with new ductile iron pipe (DIP). The replacement pipes will be in kind and will be installed in the same alignments as the existing pipes using open cut and cover. The replacement of approximately 12,500 LF of existing water piping with new 8-inch and 12-inch DIP mains along various streets in the West Side, Journal Square, McGinley Square and Bergen/Lafayette areas of central Jersey City. Other improvements include installation of over 575 new water service connections from the new main up to the curb; replacement of 35 fire hydrants and 130 inline water valves; installation of 60 new insertion valves, and site and roadway restoration. The existing water main will be cut, capped and abandoned in place unless removal is necessary to facility construction of the new infrastructure.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents