Similar Projects
Construction Manager for Phase 2 of the UNL College of Engineering
New Construction
Post-Bid
Lincoln, NE

Hamilton Hall 3rd Floor South Renovation-13609
Renovation
Results
Lincoln, NE

UNO Central Utilities Plant Boiler & Deaerator Equipment Purchase
Term Contract
Results
Lincoln, NE

SCC IT Tower Facility and Science Tower CM Proposals
Addition
Post-Bid
Lincoln, NE 68520

Andersen Hall Convert Room 229 to TV Studio-13507
New Construction
Results
Lincoln, NE 68508

Food Industry Complex New Building Entrance
Renovation
Results
$500,000 est. value
Lincoln, NE 68503

Construction Manager at Risk - Architecture Complex Renovation Phase 2
Renovation
Results
$11,393,000 est. value
Lincoln, NE 68588

SCC Residence Hall BP 1
New Construction
Post-Bid
$42,000,000 est. value
Lincoln, NE 68520

SCC Residence Hall BP 2
Renovation
Post-Bid
$50,000,000 est. value
Lincoln, NE 68520

University of Nebraska-Lincoln - Architecture Complex - Phase 2 - Mass Timber Package
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$11,393,000 CJ est. value
Lincoln, NE 68508

RFP Construction Manager at Risk - Construction Manager(S) at Risk for Southeast Community College Area
Renovation
Post-Bid
$25,000,000 CJ est. value
Lincoln, NE 68520

SCC(Southeast Community College) - Welding Facility
New Construction, Infrastructure - 80,000 SF
Post-Bid
$43,500,000 CJ est. value
Lincoln, NE 68520

New Agriculture Research Center - University of Nebraska-Lincoln
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Lincoln, NE 68508

Nebraska State College System 1233 Lincoln Mall
New Construction, Build-out, Renovation, Infrastructure - 7,600 SF
Bidding
$3,000,000 CJ est. value
Lincoln, NE 68508

University of Nebraska-Lincoln Varner Hall-South Entry Exterior Concrete Replacement
Infrastructure
Bidding
$200,000 CJ est. value
Lincoln, NE 68583

Last Updated 09/30/2022 08:41 AM
Project Title

RFQ Construction Manager at Risk - UNMC College of Dentistry Building Modernization

Physical Address View project details and contacts
City, State (County) Lincoln, NE 68503   (Lancaster County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $9,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The University of Nebraska Medical Center intends to procure a qualified contractor to provide pre-construction services and construction services as the Construction Manager at Risk (CMR) for the UNMC College of Dentistry Building Modernization project. The estimated construction cost for the CMR Guaranteed Maximum Price (GMP) is $9,000,000. The total estimated construction budget including the GMP, in-house construction services, and the Owner's contingency is $14,000,000. The existing UNMC College of Dentistry facility at 4000 East Campus Loop South is a two story structure with over 118,000 BGSF of mixed educational, research, and outpatient medical occupancies. This project is intended to modernize much of the existing facility by fulfilling significant deferred maintenance items, modernizing remaining outdated classrooms, and updating the auditorium with finishes and technology to support contemporary pedagogy and meet ADA requirements. The project will also improve student and faculty areas by creating collaborative, motivating, and restful support spaces. Office spaces will be renovated to incorporate new University standards for workspaces, will promote greater partnering, and will be more efficient through an open office layout. Research laboratories will be reconfigured to allow for recruitment of additional research faculty, improved collaboration among investigators, and maximize existing space. Restrooms will be updated to create ADA accessibility wherever possible. Mechanical, electrical, and site improvements will also be undertaken to improve energy efficiency of the building, occupant safety, and visual appeal. Questions/Clarifications Due 10/5/2022 1:00:00 PM (ET) Response to Questions/Final Addendum 10/7/2022 5:00:00 PM(ET)

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents