Similar Projects
On-Call Construction Services Project
Term Contract, Infrastructure
Bidding
Knoxville, TN

2021 Ditch Rehabilitation
Infrastructure
Bidding
Williston, TN

Stormwater Drainage Culvert Replacement Project
Post-Bid
Collegedale, TN

Three-Year Contract for Underground Utilities Locating Services
Term Contract
Post-Bid
Chattanooga, TN 37402

Jane Cove Culvert Replacement
Results
$30,000 to $40,000 est. value
Signal Mountain, TN 37377

Stream Bank Restoration Project
Results
Signal Mountain, TN 37377

2021 Streets and Drainage
Infrastructure
Bidding
Tracy City, TN

Spring Valley Bank Stabilization
Post-Bid
Chattanooga, TN 37402

The Sweeping and Drain Cleaning on Various Interstate and State Routes
Results
TN

Waterfront Drive Roadway Improvements Phase II- Rough Grading
Infrastructure
Bidding
Knoxville, TN

Moccasin Bend Bank Stabilization
Post-Bid
$1,000,000 to $5,000,000 est. value
Chattanooga, TN

Repair of The Discharge Structures for Little Chickey Pond
Results
Lakesite, TN 37379

Bridge and Culvert Construction, Maintenance, and Repair
Term Contract, Infrastructure
Bidding
Nashville, TN

Replacement of Culvert on Hickman Lane
Post-Bid
Graysville, TN 37338

Pipe Lining Project
Results
Less than $182,722 est. value
Forest Hills, TN

Reported 10/15/2021 12:00 AM
Project Title

Mills Park Culvert Pipe Repair

Physical Address View project details and contacts
City, State (County) Gatlinburg, TN 37738   (Sevier County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Culvert rehabilitation using a “spray applied method” for the purpose of eliminating infiltration and exfiltration, repair of voids, and restoration of the structural integrity of the pipe or culvert using the following TDOT spec sheet. Alternate grouts may be used upon approval of the Engineer of the City’s choosing; Please specify any deviation below and attach a product spec sheet. Any and all obstructions shall be removed using a high-pressure water jet or other means necessary to the satisfaction of the project engineer. The pipe preparation will also include the following: • removal of any loose and unsound material • cleaning and preparing the area to be sprayed • elimination of active infiltration prior to liner application • repair and filling of voids • repair and sealing of the invert and benches • repair of collapsed pipe sections by jacking or other approved methods

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents