Similar Projects
Comprehensive Infrastructure for Tampa’s Neighborhoods - Design-Build
Design
Less than $4,362,009 est. value
Tampa, FL 33602

Water Meter Replacements
Post-Bid
Jennings, FL 32053

Water System Improvements
Post-Bid
Less than $400,000 est. value
Caryville, FL 32427

46--Water Purification System
Results
Palm Beach Gardens, FL 33410

Downtown Utility Replacements
Results
Less than $740,000 est. value
Dunnellon, FL

South Middle River Forcemain Crossing Design Build
Term Contract
Construction
Less than $45,000 est. value
Fort Lauderdale, FL 33301

Utility Metering
Term Contract
Post-Bid
Orlando, FL 32816

F--Water Chlorine, Bldg Monitoring
Results
Orlando, FL 32827

450 Fire Hydrant Meter 3
Post-Bid
Homestead, FL 33030

N--Domestic Water Isolation (Shutter) Valves (Va-19-00034342)
Results
Palm Beach Gardens, FL 334106400

Advanced Metering Infrastructure (AMI)
Post-Bid
Sarasota, FL 34230

Sable Creek Potable Water Improvements
Results
FL

Water Production 24" Dezurik Valves Rebuild or Repair
Post-Bid
Tampa, FL 33602

Regional Integrated Loop System Phase 3B Interconnect (Preymore to SR 72)
Results
$12,092,815 est. value
FL

Construction Services for Veranda Preserve West Phase 2 Infrastructure Improvements
Post-Bid
Port Saint Lucie, FL 34953

Last Updated 05/20/2020 12:19 AM
Project Title

Water Main Replacement - SE 1st Avenue

Physical Address View project details and contacts
City, State (County) Ocala, FL 34471   (Marion County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the abandonment of the existing water main and the construction of the new ductile iron pipe (DIP) water main along SE 1st Avenue, between SE Broadway Street and SE 7th Street as shown on Exhibit B - Plan Set by the project boundary. The proposed work is generally described as follows: Provide all materials, labor, and equipment (in good working condition) to complete the abandonment of the existing water main and the construction of the new water main along SE 1st Avenue, including but not limited to the following: General Construction Construction Work (See the Exhibit B - Plan Set for additional specifications): Surveying/asbuilts Installation of water main with appurtenances Directional boring Replacement of asphalt, concrete sidewalks, curb & gutter Abandonment of an existing water main Replacement of fire hydrants Replacement of water services Maintenance of traffic Remove and replacement of asphalt Tapping services. Sediment control Testing Sodding and restoration of disturbed areas

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents