Similar Projects
South Clark Street Bridge Over Blackhawk Creek - FP004 - City of Davenport
Infrastructure
Conception
$770,000 CJ est. value
Davenport, IA 52802

South Clark Street Bridge Over Blackhawk Creek - FP004 - City of Davenport
Infrastructure
Conception
$770,000 CJ est. value
Davenport, IA 52802

43rd Street Reconstruction
Infrastructure
Design
$605,625 CJ est. value
Davenport, IA 52806

43rd Street Reconstruction
Infrastructure
Design
$605,625 CJ est. value
Davenport, IA 52806

3rd and Brady Streetscaping
Infrastructure
Bidding
$2,000,000 CJ est. value
Davenport, IA 52801

3rd and Brady Streetscaping
Infrastructure
Bidding
$2,000,000 CJ est. value
Davenport, IA 52801

Hillandale Road and North West Boulevard, 76th Street and North West Boulevard
Infrastructure
Post-Bid
Davenport, IA 52805

Main Street Landing - Destination Play Area and Event Lawn
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Davenport, IA 52803

23rd Street Reconstruction
Infrastructure
Results
Bettendorf, IA

Middle Road Rehabilitation
Infrastructure
Results
Bettendorf, IA

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

Middle Road Pedestrian Bridge - City of Bettendorf
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Bettendorf, IA 52722

Eastern Avenue Bridge at Goose Creek - FP005 - City of Davenport
Infrastructure
Conception
$440,000 CJ est. value
Davenport, IA 52807

Fairmount Community Center
New Construction, Infrastructure - 30,000 SF
Post-Bid
$2,200,000 CJ est. value
Davenport, IA 52804

East 2nd St. Streetscaping
Infrastructure
Results
Davenport, IA 52801

Last Updated 11/02/2022 01:04 PM
Project Title

Main Street | Multi-modal Upgrades - FP068 - City of Davenport

Physical Address View project details and contacts
City, State (County) Davenport, IA 52803   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected May 2025
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will provide enhanced multi-modal infrastructure within the Main Street corridor from 5th to Lombard. These upgrades include, but not limited to, striping, painting, signage, curb reconfiguration, removable delineators, along with selective off-street pathways. The cost for the resurfacing of the roadway will be taken out of the High Volume Street Repair program. In FY 2025, the first project will be from 5th to 12th. This project is in included in the city's 2023-2028 Capital Improvement Plan (CIP). As of November 2, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents