Similar Projects
Repaving at Locust Court
Renovation, Infrastructure - 1,308 SF
Bidding
$300,000 est. value
Milwaukee, WI 53212

Repaving at Locust Court
Renovation, Infrastructure - 1,308 SF
Bidding
$300,000 est. value
Milwaukee, WI 53212

Asphalt Repair Services
Post-Bid
Milwaukee, WI 53295

M1lb--Asphalt Repair Services
Post-Bid
Milwaukee, WI 53295

Parking Lot
Results
Milwaukee, WI 53205

Brown Deer Road, C Milwaukee and V Brown Deer, 91St Street to Deerbrook Trail
Results
Brown Deer, Milwaukee, WI

Habitat for Humanity ReStore
Addition, Infrastructure - 27,078 SF
Pending Verification
Wauwatosa, WI 53222

Hot Oil Chip Sealing
Infrastructure
Bidding
$60,000 est. value
Franklin, WI

Burnham Pointe Park
Post-Bid
Less than $231,532 est. value
West Allis, WI

2021 Concrete Pavement Patch
Results
Less than $700,000 est. value
Cudahy, WI

Repaving at College Court
Infrastructure
Bidding
$300,000 est. value
Milwaukee, WI 53208

East-West BRT Intersection
Post-Bid
Milwaukee, WI

2021 Green Infrastructure Upgrades Bid Package 2
Results
Milwaukee, WI 53204

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Bidding
$200,000 est. value

2021 Time And Material Zoological Gardens
Term Contract
Post-Bid
Milwaukee, WI

Last Updated 06/09/2022 01:39 AM
Project Title

Safe Routes To School Implementation Phase I

Physical Address View project details and contacts
City, State (County) Milwaukee, WI   (Milwaukee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project no. 1 description: concrete curb and gutter, sidewalk, asphaltic surface, concrete pavement, marking and signing, etc. Located at: Various locations around eight schools in the City of Milwaukee. Time for Completion: All work on this contract shall be completed by October 15, 2022. Liquidated Damages, per diem: will be calculated as per section 108.11 of WisDOT Standard Specifications. The residency requirement for this project is 0% of all hours worked on the project. One quarter of these hours must be attributable to residents living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53212, 53215, and 53233. The SBE requirement for this project is 0% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive.For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusion's (OEI) website . If there are any questions regarding SBE firms, please contact the OEI office at 414-286-5553. The apprenticeship requirements for this project are: N/A. If this contract is awarded at $500,000 or higher, 25% of all apprentice labor hours must be worked by apprentices certified for participation in the Residents Preference Program and 40% of all apprentice labor hours must be attributed to apprentices living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53212, 53215, and 53233 The contractor shall specifically note the SBE, residency, and apprenticeship forms for this project. If the forms are not filled out properly, it will be cause for rejection of the bid. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. For those bids being submitted through Bid Express and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works Contract Office by emailing DPWbids@milwaukee.gov. The original bid bond document must then be submitted by the contractor to the Department of Public Works Contract Office in-person or by mail to 841 N Broadway, Rm. 506, Milwaukee, WI 53202, immediately upon being notified that they are the apparent low bidder. PAYMENT MONITORING REQUIREMENTS: All Contractors awarded a contract valued at $25,000.00 or more are required to participate in training on the City of Milwaukee's B2GNow contract compliance software within 30 days of the contract award date. Throughout the contract term, Contractors are required to regularly provide timely subcontractor payment information in the City's contract compliance software. Please contact the Office of Equity and Inclusion (OEI) at 414-286-5553 should you have any questions or concerns regarding the training or reporting process. PAYROLL MONITORING REQUIREMENTS: The Prime Contractor awarded this project is required to participate in training on the City of Milwaukee's LCP Tracker Labor Compliance Software after the date of contract award. Throughout the contract term, Contractors are required to regularly provide timely payroll information via LCP Tracker. Please contact the DPW Contracts Office at 414-286-3314 should you have any questions or concerns regarding the training or reporting process.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents