Similar Projects
San Souci Road Elevation Design
Infrastructure
Design
WA

UST Inspect Maintain and Repair
Alteration
Design
$1,000,000 est. value
WA

SR 525, Mukilteo Pedestrian and Traffic Improvements MP 8.32 to MP 8.43
Infrastructure
Bidding
WA

Call for Artists Highway Two Easy Street Roundabout
Infrastructure
Bidding
$175,000 to $200,000 est. value
Wenatchee, WA

Garrison Middle School Sidewalk Improvement
Infrastructure
Post-Bid
Walla Walla, WA 99362

Curb Management Plan
Infrastructure
Post-Bid
$150,000 to $225,000 est. value
Bellevue, WA 98007

Pavement Repair and Manhole Adjustment 2021
Alteration
Results
WA

Nugget Park Sidewalk Replacement
Infrastructure
Results
$275,000 to $350,000 est. value
Brier, WA 98036

Mill Avenue Overlay ES-556
Infrastructure
Bidding
$1,300,000 to $1,500,000 est. value
Bellingham, WA 98229

I-90, SR18 I/C to Deep Creek - Interchange Improvements and Widening Project
Infrastructure
Post-Bid
WA

Harbour Reach Drive Improvements
Infrastructure
Results
$915,224 est. value
Mukilteo, WA 98275

I-90, Dodson Road to Adams County Line- Paving
Infrastructure
Bidding
$7,500,000 to $10,000,000 est. value
WA

Ephrata Headquarters Pedestrian Crosswalk Replacement
Infrastructure
Post-Bid
$90,000 est. value
Ephrata, WA

2021 Sidewalk And ADA Improvements
Infrastructure
Results
$200,000 to $300,000 est. value
Auburn, WA 98092

North Seattle Mobility Improvements Package One
Infrastructure, Alteration
Bidding
Seattle, WA

Reported 12/08/2021 12:00 AM
Project Title

4Bikes Project

Physical Address View project details and contacts
City, State (County) College Place, WA   (Walla Walla County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $390,000 to $470,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes improvement of 4th Street from Academy Way to College Avenue, including street lights, cycle track extension, approximately 1,000 linear feet of curb and gutter, approximately 1,100 square yards of sidewalk replacement, and other work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents