Similar Projects
National Vehicle and Fuel Emissions Laboratory Operations, Maintenance, and Janitorial Contract
Alteration
Design
Ann Arbor, MI

Lead Based Paint Hazard Control (LBPHC) Program Services Provider
Term Contract
Sub-Bidding
Flint, MI 48502

Residential Asbestos Surveys
Term Contract
Sub-Bidding
Kalamazoo, MI 49007

S201--Window Cleaning Ann Arbor VA
Term Contract
Post-Bid
Ann Arbor, MI 48109

Gutter and Exterior Building Pressure Washing Cleaning Services
Term Contract
Post-Bid
Auburn Hills, MI 48326

Wildlife Control
Alteration
Results
Lansing, MI

On-Call Historical Consulting Services
Alteration
Results
Rochester Hills, MI

Residential Snow Removal Services
Term Contract
Sub-Bidding
Berkley, MI 48073

Request for Proposals: Solid Waste Disposal & Recycling Services: 2021-22 Food Service Management Company
Term Contract
Post-Bid
Detroit, MI 48214

Exterior Window Cleaning and Power Washing Outdoor Surfaces at Detroit Operations and Service Center
Alteration
Results
Detroit, MI 48226

Professional Compost Site Removal and Maintenance
Term Contract
Sub-Bidding
Kalamazoo, MI 49048

Pest Control Services
Alteration
Post-Bid
Highland Park, Livonia, Taylor, Wayne, MI 48180

Guaranteed Energy Savings Project Buchanan Community Schools 2022
Term Contract
Sub-Bidding
Buchanan, MI 49107

Pest Control Bed Bug Treatment and Inspections
Term Contract
Post-Bid
Niles, MI

Cemeteries Grounds Maintenance
Term Contract
Sub-Bidding
Saginaw, MI 48601

Last Updated 10/12/2022 02:34 PM
Project Title

Stump Grinding on M119 between Harbor Springs and Cross Village

Physical Address View project details and contacts
City, State (County) Harbor Springs, MI 49740   (Emmet County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $25,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Provide all labor and equipment necessary to complete stump grinding on M119 between Harbor Springs and Cross Village from October 31 through November 30, 2022. This will include an operator and equipment required to grind, haul, and dispose of approximately 120 stumps. The stump grinder must be auger style. Traffic control will be provided and you must provide Proof of Insurance. All work will be done to MDOT specifications. Limits of the Job: To be completed beginning 10/31/22 and ending by 11/30/22. All bidders must bid by Price per Hour. The Emmet County Road Commission reserves the right to accept or reject any or all bids or waive irregularities in the bid procedure and to award in the best interest of the Road Commission.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents