Similar Projects
40th-San Pablo Transit Hub and 40th Street Reconstruction - City of Emeryville
Infrastructure
Conception
$10,787,000 est. value
Emeryville, CA 94608

Castro Valley Boulevard Corridor Improvements from San Miguel Avenue to Stanton Avenue - Alameda County
Infrastructure
Conception
$1,250,000 est. value
Castro Valley, CA 94546

Village Green Apartments
New Construction, Infrastructure - 12,000 SF
Design
$42,000,000 CJ est. value
San Lorenzo, CA 94580

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Water Pollution Control Plant Dirt Relocation 2021
Infrastructure
Bidding
$4,000,000 CJ est. value
San Leandro, CA 94577

Highway Safety Improvement Program HSIP 8 Oakland Hills
Infrastructure
Post-Bid
Oakland, CA

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

Accessible Improvement Program - Phase 1
Infrastructure
Results
$1,000,000 to $5,000,000 est. value
Oakland, CA

Excavation, HMA, Structural Concrete, Minor Concrete and Drainage
Infrastructure
Results
$23,400,000 est. value
CA

Shattuck Avenue Apartments
New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Berkeley, CA 94704

Admirals Cove Infill
Demolition, New Construction, Infrastructure - 348,850 SF
Pending Verification
$72,011,310 CJ est. value
Alameda, CA 94501

1598 University Avenue Apartments
Demolition, New Construction, Infrastructure - 5,700 SF
Pending Verification
$80,000,000 CJ est. value
Berkeley, CA 94703

Sunol Ridge Roadway Reinforcement - Alameda County
Alteration
Conception
$1,000,000 est. value
Castro Valley, CA 94552

Grayson Street Life Sciences Facility Development
New Construction, Infrastructure - 187,000 SF
Design
$63,000,000 CJ est. value
Berkeley, CA 94710

Traffic Signal and Streetlight Maintenance Services
Infrastructure
Post-Bid
Livermore, CA

Last Updated 09/29/2022 02:05 PM
Project Title

East Bay Greenway Segment II (Seminary Avenue to 69th Avenue)

Physical Address View project details and contacts
City, State (County) Oakland, CA 94621   (Alameda County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $4,079,241 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of September 29th, 2022, project has not been awarded yet. It is expected to be awarded within 2-4 weeks from now. The East Bay Greenway project will construct a multi-use path (MUP) on the east side of San Leandro Street from Seminary Avenue to 69th Avenue. Other improvements include curb extension and modifications, median modifications, excavations, pavement reconstruction, fence, irrigation and landscaping, high visibility crosswalks, ADA compliant curb ramps, signing and striping, pedestrian and streetlights, and signal modifications. In addition, the project will repair fence and bollards on the existing shared bicycle and pedestrian path along San Leandro Street between 75th Avenue and 85th Avenue.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents