Similar Projects
Pump Station 2 Grinder Project
Bidding
Gilbertsville, PA

Pump Station 5 Modifications
Infrastructure
Bidding
East Stroudsburg, PA

Bunker Hill Water Pump Station
Post-Bid
Central City, PA 15926

WYE Lift Station Bar Screen Replacement
Post-Bid
Aliquippa, PA 15001

Grinder Pump - General Construction
Results
West Middlesex, PA

Long Term Control Plan Project 2018 Lift Station Improvements - General Construction
Results
Rochester, PA 15074

Municipal Drive Pump Station And Force Main, General/Mechanical
Construction
$1,200,000 est. value
Downingtown, PA 19372

Kohler Tract Pumping Station - General Construction
Construction
$1,300,000 est. value
Emmaus, PA 18049

George R. Sweeney Water Treatment Plant Raw Water Pump Station Upgrades - General/Mechanical
Addition
Bidding
Greensburg, PA

Clubhouse Outdoor Pool - Filter Room Mechanicals
Post-Bid
Blooming Grove, PA 18428

Springhill Farm WWTF Pump Station and Sanitary Force Main
Results
Chadds Ford, PA

Construction of the Cupola Pump Station Replacement- General Construction
Construction
$750,000 to $1,000,000 est. value
Honey Brook, PA

Influent Pump Station Odor Control Replacement
Renovation
Bidding
New Cumberland, PA 17070

Eastwood Pump Station Elimination Project
Post-Bid
North East, PA 16428

Knox Avenue Pumping Station Upgrades
Results
$650,000 est. value
Easton, PA 18043

Last Updated 06/17/2021 03:44 PM
Project Title

Cynwyd Pump Station Bypass Connection and Flow Meter Installation

Physical Address View project details and contacts
City, State (County) Bala Cynwyd, PA 19004   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes, but is not limited to, excavation; wet tap; construction of bypass connection within a bypass manhole; measures to maintain station flow and operations during the installation of flow meter and pressure sensor with associated valving and appurtenances; and interior and exterior restoration.

Details

Lift and Pump Stations, Addition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents