Similar Projects
Last Updated | 05/31/2022 09:51 AM |
Project Title | Ft McCoy REECE Scoute Range D/B/B New Construction IFB |
Physical Address | View project details and contacts |
City, State (County) | Fort McCoy, WI (Monroe County) |
Category(s) | Government/Public |
Sub-Category(s) | Military Facility |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | Greater than $10,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | TYPE OF SET-ASIDE: This acquisition will be a Full and Open procurement with a HUBZone Price Evaluation Preference of 10% used in accordance with FAR 19.1307. DESCRIPTION: The U.S. Army Corps of Engineers (USACE) Louisville District intends to issue a Request for Proposal (RFP) W912QR21B0006 for the construction of a new scout range located at Ft. McCoy, WI. A description of the construction project is as follows: This project is a design-bid-build project to construct a new Scout/Recce Gunnery Complex on existing Range 29 at Ft. McCoy, WI. This range is designed to train and test scout reconnaissance crews and sections on the skills necessary to detect, identify, engage, and defeat stationary and moving infantry and armor targets in a tactical array. Down range work will consist of demolition of existing target structures and berms and construction of aggregate tank maneuver trails, aggregate service trails, concrete pads, battle positions, drainage pipes and structures, electrical and communications cabling, range limit markers, lane markers, and target emplacements as described below: New construction: 1 Moving Armor Target (MAT), 96 Stationary Infantry Target emplacements (SIT), 32 Widened SIT (w-SIT), 4 Moving Infantry Target Emplacements (MIT), 35 Stationary Armor Target Emplacements (SAT), 2 Two-Tier Battle Positions (BP), 4 Reverse Slope BPs, and 4 Firing Positions. Refurbish: 3 existing MATs This project will also include upgrades to some existing Range Operations and Control Area (ROCA) facilities, demolition of an existing vault latrine and construction of a new wet latrine. Upgrades to the existing ROCA include data connections to the existing Range Control Tower (RCT) and After Action Review Building (AAR), lightning protection for the existing Covered Mess and Bleacher Enclosure, and a cover and lightning protection for the existing Ammunition Loading Dock. |
||||||||||||||||||||||||||||||||||||
Details | Military Facility, New Construction.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |