Similar Projects
Public Accessibility Concrete Upgrades to Various Jackson Township Buildings
Infrastructure, Alteration
Bidding
Jackson, NJ

FY 2020 CDBG Barrier Free Access Improvements at the Police Station Project
Post-Bid
Waretown, NJ 08758

T0278 - Concrete Curb, Sidewalk and Gutter Construction - NJDOT
Infrastructure
Post-Bid

Drum Point/Emma Havens Young Elementary School Parking Lot Improvements - Phase II
Results
Brick, NJ 08723

Construction of A New Traffic Signal, Widening of Road, Milling, Paving, Curb, Sidewalk, Curb Ramps and Drainage Structures
Results
Less than $1,000,000 est. value
Lacey, NJ

Improvements to Laurelhurst Phase 1 and 2
Results
Brick, NJ 08724

Pinewood Park Parking Lot Improvements
Results
NJ 08724

Construction of Concrete Sloping Curb Islands on C.R. 33 Lacey Road -Two Locations, Township of Lacey
Results
$1,000,000 est. value
Toms River, NJ

Construction of Traffic Signal at James Street (CR-32) and Williams Street
Results
$1,000,000 est. value
Lakewood, NJ 08701

NJDOT Trust Fund: Rt. 88 Pedestrian Safety Improvement Project
Results
Lakewood, NJ

Euclid Avenue Area Improvements - Phase I
Results
$875,000 est. value
Manasquan, NJ 08736

CDBG FY 2020 Handicap Accessible Improvements at Various Street Corners and Handicap Accessible Sidewalk Installations Along Taylor Avenue (Between Delaware Avenue and Seagull Lane)
Results
Beach Haven, Long Beach, NJ 08008

Borough Hall Parking Lot Reconstruction, Resurfacing and Provide Handicap Access
Results
Surf City, NJ 08008

School Street Sidewalk Project
Results
Point Pleasant, NJ 08742

Replacement of Curb and Sidewalk at Various Locations
Results
$1,000,000 est. value
NJ

Last Updated 02/03/2022 01:32 PM
Project Title

Sidewalk and Curb Installation Marine Street

Physical Address View project details and contacts
City, State (County) Tuckerton, NJ 08087   (Ocean County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the removal and replacement of approximately 224 LF of concrete curb, 85 SY of concrete sidewalk, 26 SY of driveway apron, installation of one (1) handicap detectable warning mat and all restoration and clean up along Marine Street in the Borough.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents