Similar Projects
Construction of a Boating Access Facility on Lake Greenwood
Infrastructure
Bidding
Greenwood, SC 29649

Construction of Boat Landing on Broad River at Lockhart
Infrastructure
Bidding
$300,000 to $600,000 est. value
SC

Battery Pringle Revetment Renovation Project. The Dill Property
Renovation
Post-Bid
James Island, SC

Surfside Beach Fishing Pier Reconstruction Project
Post-Bid
Less than $13,400,000 est. value
Surfside Beach, SC 29575

Belton Kayak Launch
Results
$1 to $1,000,000 est. value
Belton, SC 29627

Surfside Beach Fishing Pier Restoration Project
Results
Surfside Beach, SC 29575

Charleston-Capers Island Dock Replacement
Infrastructure
Bidding
$170,000 to $210,000 est. value
SC

Charleston - Santee Coastal Reserve Dock Replacement
Post-Bid
$250,000 to $350,000 est. value
McClellanville, SC 29458

Whitehall Drive Boardwalk
Results
Beaufort, SC 29902

Folly Beach DPS Marine Launch Dock
Infrastructure
Bidding
Folly Beach, SC

State Park Piers Repair - Hunting Island
Post-Bid
$750,000 to $1,000,000 est. value
Saint Helena Island, SC 29920

Marina Dock Rehabilitation
Results
Isle of Palms, SC 29451

Furnish and Install A Dock at Pack's Landing
Post-Bid
Rimini, SC

Marine Contractors for the Construction of the Battery Park Pedestrian Bridge
Results
North Charleston, SC 29406

Underwater Piling Installation
Post-Bid
$25,000 to $100,000 est. value
Eastover, SC

Last Updated 12/05/2021 11:33 PM
Project Title

Dunes Walkover Project

Physical Address View project details and contacts
City, State (County) Myrtle Beach, SC   (Horry County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of replacing three (3) walkovers with new wooden walkovers. This includes the demo and replacement of current walkovers, adding concrete walkways, replacing shallow deck areas, elevated deck section bracing, stairs, sitting areas and shower sections. All disturbed areas must be cleaned, graded and seeded. Walkovers will go to the dune line.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents