Similar Projects
New Hampton Maintenance Garage Roof Replacement
Renovation
Sub-Bidding
$90,000 CJ est. value
New Hampton, IA 50659

Mason City Maintenance Garage Roof Replacement
Renovation
Sub-Bidding
$90,000 CJ est. value
Mason City, IA 50401

Roof Tear-Off and Replacement
Alteration
Post-Bid
Clinton, IA

Sheriff Office - Roof Removal and Replacement
Alteration
Post-Bid
Dubuque, IA 52001

Young Arena Southeast and Southwest Roof Replacement
Alteration
Results
Waterloo, IA 50701

National Roofing Program (Nrp) - Roofing Construction Project #16
Term Contract
Results
$1,000,000 to $5,000,000 est. value
Des Moines, IA 50315

Marion Public Services Maintenance Facility Metal Roof Replacement
Renovation
Pending Verification
$718,000 CJ est. value
Marion, IA 52302

Marion Public Services Building Single Ply Roof Overlay
Renovation
Pending Verification
$452,000 CJ est. value
Marion, IA 52302

Partial Roof Replacement Dallas Center 5-6 School
Renovation
Sub-Bidding
$200,000 CJ est. value
Dallas Center, IA 50063

2022 Roof Replacement at Gaylord Smith Building
Alteration
Post-Bid
Sioux City, IA 51106

Innovative Teaching and Technology Center Roof Replacement and Exterior Repairs
Alteration
Results
Less than $4,900,000 est. value
Cedar Falls, IA

The Eastern Iowa Airport Terminal Building - HVAC Cooling Room Install Roof Access Hatch
Renovation
Sub-Bidding
$250,000 CJ est. value
Cedar Rapids, IA 52404

Pearson Hall Re-Roofing Project
Alteration
Post-Bid
$200,000 est. value
Maquoketa, IA 52060

IVH-Dack Sundeck Roof Replacement
Alteration
Results
Marshalltown, IA

Roof Coating located on the Pole Building at the Ames
Renovation
Sub-Bidding
$150,000 CJ est. value
Ames, IA 50010

Last Updated 03/20/2023 08:36 AM
Project Title

2023 Roofing Replacements

Physical Address View project details and contacts
City, State (County) Pleasant Hill, IA 50327   (Polk County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $695,600 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes the removal and replacement of the roofs on Level L at the High School, Level Z of the Junior High School and Level G of Four Mile Elementary. The roof replacement at Four Mile Elementary is an alternate bid. The work must commence on or about June 01, 2023 and must be substantially completed on August 04, 2023. The project must reach final completion no later than August 11, 2023. Each Bidder shall accompany the Bid with a Bid security, in a separate envelope, as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of the contract corporate surety bond or bonds, acceptable to the Owner, for the faithful performance of the contract, in an amount equivalent to one hundred percent of the amount of the contract. The bidder's security shall be in an amount equivalent to 5% of the bid amount, and shall be in the form of a cashier's or certified check drawn on a bank in Iowa or a bank chartered under the laws of the United States of America, or a certified bank share draft drawn on a credit union in Iowa or chartered under the laws of the United States of America or a bid bond with corporate surety satisfactory to the Owner. The bid security will be held by the Owner until a contract is fully executed and bonds are approved by the Owner. All Bidders are required to provide a statement regarding their residency status as required by 875 Iowa Administrative Code Chapter 156. Contractors using "materials, supplies, and equipment" on projects in designated "exempt entities" may purchase these items without liability for the sales tax. The contractor must have a purchasing agent authorization letter and an exemption certificate from the public entity to present to the retailer, which specifies the construction project and will be available for that project only. Owner will issue an authorization letter and an exemption certificate to the contractor and/or subcontractors for the purchase or use of building materials, supplies, and equipment to be used on this project only. DO NOT include sales tax on your bid form. No bid may be withdrawn for a period of 30 days after the date of the scheduled closing time for the receipt of bids. Bidders shall be prepared to submit a performance bond and payment bond conditioned on the faithful performance of the contract. Out-of-state bidders shall be prepared to submit an Out-ofState Contractor Bond to the Iowa Division of Labor in accordance with Chapter 91C of the Code of Iowa. By virtue of statutory authority, a preference will be given to products and provisions grown and coal produced within the State of Iowa, and to Iowa labor to the extent lawfully required under Iowa law. It is the intent of the Owner to award a contract to the lowest responsible, responsive bidder provided the bid has been submitted in accordance with the bidding requirements. The Owner reserves the right to waive informalities or irregularities. The Owner reserves the right to reject any or all bids.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents