Similar Projects
Ground Maintenance Package C
Term Contract
Sub-Bidding
Memphis, TN 38116

Wire #1/0 AWG Soft- Drawn
Term Contract
Sub-Bidding
Memphis, TN 38103

Electric Smart Meters
Term Contract
Post-Bid
Memphis, TN 38103

Veteran Cemetery Lawn Treatment
Term Contract
Post-Bid
Memphis, TN 38103

Construction of: Curb and Gutter Repair FY2023 With Two (2) One (1) Year Extensions
Term Contract
Results
$997,840 CJ est. value
Memphis, TN 38103

Construction of: Sidewalk Repair With Two (2) One (1) Year Extensions
Term Contract
Results
Memphis, TN 38103

Painting Services
Term Contract
Sub-Bidding
Memphis, TN 38103

Large Directional Drilling
Term Contract
Post-Bid
Memphis, TN 38103

Fitness Center Transformer Replacement
Renovation
Results
$195,000 CJ est. value
Memphis, TN 38103

Drain Cleaning on Various Interstate and State Routes
Term Contract
Sub-Bidding
Memphis, TN 38117

Turf Maintenance and Repair - Rebid
Term Contract
Post-Bid
Memphis, TN 38103

Gas Inspection Montgomery Vacant Units
Term Contract
Sub-Bidding
Memphis, TN 38103

Sewer Infrastructure Locating Services TN811
Term Contract
Post-Bid
Memphis, TN 38103

Annual Water Valve and Fire Hydrant Maintenance Services
Term Contract
Sub-Bidding
Collierville, TN 38017

Maintenance Repair and Overhaul Facility Site Preparation
Renovation, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Memphis, TN 38116

Last Updated 09/27/2023 09:17 AM
Project Title

Installation of Three (3) Bus Charging Stations

Physical Address View project details and contacts
City, State (County) Memphis, TN 38108   (Shelby County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $439,306 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 27, 2023 this project has not yet been awarded. A timeline for award has not yet been established.** **As of August 25, 2023, this project has not yet been awarded. Selection may take place before MATA’s Board of Commissioners in September. Installation of Three (3) Bus Charging Stations. MATA reserves the right to reject any and all BIDS, and to waive any informality in bidding. Requests for clarification or approved equal must be submitted in writing to Frances Boyland, Contract Administrator, MATA 1330 Levee Road, Memphis, TN 38108 or email to fboyland@matatransit.com and must be received no later than 11:00 a.m., local time July 17, 2023, The electrical scope of this project consists of adding three (3) electric vehicle charging stations for new electric buses that will be charged in the maintenance yard ofthe Memphis Area Transit Authority (MATA) property located at 1370 Levee Road, Memphis, TN 38108. The charging stations are Direct Current (DC) type of Chargepoint+ manufacturer. Charging stations consist of Power Block (power converter) and a Power Link (electrical "dispenser"). Each charging station requires 260A and roughly 216kW at unity power factor. To accomplish this project the electrical work will consist essentially ofthe following items: A. Replace existing 300kVA utility own transformer with 750kVA. This work to be performed by Memphis Light Gas & Water (MLGW). MLGW will reuse the existing electrical meter measuring new charging station load. B. Provide new underground feeders (conduit and wiring) from new transformer to new NEMA 3R, 1200A, 480V power distribution panelboard mounted in unit strut rack or concrete pad, whicheveris most feasible per electrical equipment procured and installation recommendations. Underground conduit shall be in steel reinforced concrete duct hank, Coordination with MLGW is required for connection ofnew feeders to new transformer. C. Strut rack or concrete pad shall be installed on new concrete slab indicated in the Civil drawings. D. 1200A rated power distribution panelboard shall have a 1000A Main Circuit Breaker rated for 80% trip (800A). The power distribution board shall have three (3) separate 350A/3P circuit breakers to power to each ofthe Chargepoint+'s power blocks. E. The power distribution shall have a Surge Protection Device (SPD) as recommended per Chargepoint+ charging station installation manual. The overcurrent device for the SPD shall be sized according to SPD manufacturer'srecommendation. F. Provide underground conduit and wiring in steel reinforced concrete duct banks from power distribution panelboard to power blocks and from power blocks to power links. Size of conduit and wire are indicated on electrical drawings. G. Provide all new grounding as required per Chargepoint+ recommendations. H. Provide bollards for protection against damage to electrical equipment and charging stations. Bollards shall be at least 36" away from electrical equipment and to be 48" apart. Height must be 42" above grade and made of 6" steel conduit filled with concrete.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents