Similar Projects
New High School - Wellen Park
New Construction - 325,000 SF
Conception
$120,000,000 est. value
Sarasota, FL

Fruitville Building 5 Renovation
Renovation
Conception
$2,750,000 est. value
Sarasota, FL

Yulee High School Classroom Addition
Addition
Design
Less than $6,250,000 est. value
Yulee, FL 32097

Deerfield Beach High School SMART Program
Design
$2,902,214 est. value
Deerfield Beach, FL 33441

Construction Manager - Future Capital Projects
New Construction
Bidding
Quincy, FL

Apollo Middle School - Smart Program Renovations
Renovation
Bidding
$6,300,000 est. value
Hollywood, FL 33024

George Washington Carver Middle School Renovations
Post-Bid
Less than $2,799,203 est. value
Coral Gables, FL 33133

Fairview Middle School Site Improvements - Phase 5C
Post-Bid
Tallahassee, FL 32305

Construction Management Services - YMCA Partnership Middle School
New Construction
Results
Less than $50,000,000 est. value
Saint Petersburg, FL 33702

Wingate Oaks Center - Smart Program Renovations
Renovation
Results
Less than $1,706,457 est. value
Fort Lauderdale, FL 33311

The Pine School
Addition - 22,369 SF
Construction
$6,800,000 est. value
Hobe Sound, FL 33455

Alazhar School
Addition - 19,785 SF
Construction
$1,711,950 est. value
Tamarac, FL 33068

Future School Addition
Addition
Pending Verification
$19,000,000 est. value
Naples, FL

Windy Hill Middle School Addition
Addition
Pending Verification
$13,200,000 est. value
Clermont, FL 34711

Mantanzas High School Addition
Addition
Conception
$17,500,005 est. value
Palm Coast, FL 32137

Reported 06/07/2022 12:00 AM
Project Title

Rhodora Donahue Academy - Classroom Expansion

Physical Address View project details and contacts
City, State (County) Ave Maria, FL 34142   (Collier County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Sub-Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $3,500,000 [brand] Estimate
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

This project is an interior improvement to an existing 48,346 sq. ft. two story building for an existing school "Rhodora J. Donahue Academy of Ave Maria" (educational occupancy). The existing building is a two-story type ii b unprotected, sprinkled building under the 2020 FBC, 7th edition and a type ii (0,0,0) per NFPA, 7th edition. This is based upon observation of the existing building construction documents. The scope of work is to provide new floor area (2233 sq. ft.) where it originally was a double height space for the addition of new classrooms. Other classrooms on the 2nd floor were not finished in the original construction and shall be finished as shown on these plans. The occupant load of the 2nd floor is increased by 74 from the original construction. This is for the addition of classroom #1 and #2 on the 2nd floor. The total occupant load of the 2nd floor as calculated by the FFPC and FBC will end up being over 500 occupants as shown on the life safety plan at sheet L1. Therefor a new 3rd floor egress stair was provided for. The corridors delineated as smoke partitions shall have the gypsum board run full height to the underside of the floor or roof structure above. The space above the ceiling is not used as an air plenum. Existing HVAC duct work to be reconfigured and new A/C system installed for new conditioned space. Refer to mechanical plans. Electrical modification to be completed per electrical plans.

Details

Middle/Senior High School, 2 Stories Above Grade, 48,346 SF Addition.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents