Similar Projects
200,000-Gallon Elevated Tank Interior Repainting and Minor Repair
Infrastructure, Alteration
Bidding
$40,000 est. value
Bronson, MI

Sodium Hypochlorite Storage Tank Replacement
Infrastructure
Bidding
$300,000 est. value
Ann Arbor, MI 48103

Water Storage Distribution System (WSDS)
Post-Bid
Detroit, MI

Removal of the Underground Storage Tank at the Jackson Street Transportation Facility
Post-Bid
Kalamazoo, MI 49001

World-Wide Water Storage Tank Remediation
Term Contract
Results

World-Wide Water Storage Tank Remediation
Term Contract
Results

Underground Storage Tank Assessment and Recommendation Services
Infrastructure
Post-Bid
Detroit, MI

150,000 Gallon Water Tank and Scada Improvements, Contract B
Results
Vermontville, MI

Underground Storage Tank System Removal
Infrastructure
Post-Bid
Farmington, MI 48336

South Water Tower
Results
$232,000 est. value
Mason, MI 48854

Calcium Chloride Tanks - St Ignace Garage, L'Anse Garage
Infrastructure
Post-Bid
MI

Contract 1 - Water Tower Improvements
Results
McBain, MI

Underground Storage Tank Removal and Above Ground Tank Install
Infrastructure
Post-Bid
Delton, MI

Cleanout of East Sludge Tank
Infrastructure
Results
Flint, MI

Replace Underground Water Tank - Sleeper State Park
Infrastructure
Post-Bid
Caseville, MI 48725

Reported 05/13/2022 12:00 AM
Project Title

2022 DB Tank and Soil Removal Indefinite Scope Indefinite Delivery

Physical Address View project details and contacts
City, State (County) Lansing, MI   (Ingham County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents