Similar Projects
Downtown Streetscape Crosswalk Enhancements
Infrastructure
Conception
Santa Maria, CA

Slope Paving, Plant Establishment and Modifying Irrigation System
Infrastructure
Bidding
$3,790,000 est. value
CA

Shelton Oaks or Rhodes Terrace Landscape Improvement Project
Infrastructure
Bidding
Chico, CA 95928

Tree/Forest Thinning Services
Infrastructure
Post-Bid
Sonoma, CA

As-Needed Project Controls and Construction Management Services No.2 - MLBE
New Construction, Infrastructure
Post-Bid
$1,500,000 est. value
San Francisco, CA

Paving Of Residential And Major Streets Rehabilitation Project
Infrastructure
Results
$1,500,000 est. value
Baldwin Park, CA 91797

Construct Infiltration Area and Vegetation Control and Pave Gore Area
Infrastructure
Results
CA

The BLOC apartments
New Construction, Alteration
Pending Verification
Los Angeles, CA 90017

Grounds and Landscape Services for Exposition Park
Renovation, Term Contract
Bidding
CA

Needed Project Controls and Construction Management Services No 1
New Construction, Infrastructure
Post-Bid
$3,000,000 est. value
San Francisco, CA

Arborist,Tree and Other Plant Services
Infrastructure
Results
$250,000 est. value

Deer Ridge Frontage Landscaping Improvements
Infrastructure
Bidding
$720,000 est. value
Brentwood, CA

2021 Hazard Tree Removal Project
Infrastructure
Post-Bid
Santa Rosa, CA

Key Boulevard Tree Trimming
Term Contract
Results
Richmond, CA 94805

Camarillo Landscape Maintenance
Term Contract, Alteration
Post-Bid
$10,000 est. value
Camarillo, CA 93010

Last Updated 02/11/2022 03:10 PM
Project Title

North Vineyard Station Open Space Preserve Trail and Landscaping Project - Elder Creek Phase 1B

Physical Address View project details and contacts
City, State (County) CA   (Sacramento County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,715,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install native plantings, irrigation, and multi-use trails within an open space preserve creek corridor along a section of Elder Creek. The Project will install native plantings over approximately 16.8 acres, approximately 26,000 feet of irrigation pipe, approximately 2,185 feet of paved bicycle path, approximately 1,510 feet of equestrian trail, a low flow creek trail crossing, and all other work specified on the plans and in the specifications. The Project creek section will be landscaped as a natural riparian corridor by planting native trees, shrubs, wetlands, and grasses within the creek bottom, along the channel banks, and surrounding uplands. The Project includes a minimum 5-year monitoring period that begins after plant installation.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents