Similar Projects
RFP - Capital Improvement Plan Development Project
Term Contract
Conception
Sylvester, GA 31791

City Farmers Market Expansion
Addition, Infrastructure - 1,570 SF
Conception
Snellville, GA 30039

260-270 Drummen Court Drainage Improvement and Maintenance
Infrastructure
Design
$257,664 CJ est. value
Sandy Springs, GA 30328

260-270 Drummen Court Drainage Improvement and Maintenance
Infrastructure
Design
$257,664 CJ est. value
Sandy Springs, GA 30328

Coastal Pines Technical College Precision Machining & Manufacturing Building
New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Kingsland, GA 31548

Construction of a Bridge and Approaches
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Atlanta, GA 30329

Lighting Upgrades
Infrastructure
Sub-Bidding
$600,000 CJ est. value
East Point, GA 30344

Storm Drainage Infrastructure System Construction for Public Works Stormwater Project (Three (3) Year Multiyear Contract)
Term Contract
Sub-Bidding
$325,000 CJ est. value
Decatur, GA 30030

Purchase of Water Meters on an Annual Contract
Post-Bid
Lawrenceville, GA

2021 City Wide Meter Project
Post-Bid
Baxley, GA

South Annexation - GEFA Phase III Infrastructure
Results
Richmond Hill, GA 31324

Dunbar Road Water Main Extension
Results
Warner Robins, GA 31095

Athens Retail Infrastructure And R.O.W. Site Development
Infrastructure
Construction
Athens, GA 30606

Spela Subdivision
New Construction, Infrastructure
Pending Verification
$100,000,000 CJ est. value
Newnan, GA 30265

Boulevard Warehouse Renovation
Renovation, Infrastructure - 21,344 SF
Pending Verification
$5,000,000 CJ est. value
Atlanta, GA 30312

Last Updated 07/22/2022 06:32 AM
Project Title

Turner Church Pump Station Force Main Additions

Physical Address View project details and contacts
City, State (County) McDonough, GA 30252   (Henry County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,132,581 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All Bidders must have a State of Georgia Utility Contractor License and must employ a state "Utility Manager" certificate holder who will have oversight of all the work. The work to be done consists of furnishing all materials, equipment and labor for the construction of: Approximately 7,800 linear feet 12-inch force main, all complete with appurtenances. Time allotted for construction is 180 consecutive calendar days for substantial completion and 210 days for final completion. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. All proposals shall be accompanied by a Bid Bond drawn in favor of the City of McDonough, Georgia in the amount of at least 10% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the City of McDonough, Georgia. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the City of McDonough, Georgia as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract. Drawings and Specifications are open to public inspection at the office of the City of McDonough, Georgia and at the offices of Turnipseed Engineers in Augusta and Atlanta, Georgia. Upon receipt of all documents in undamaged condition within 30 days after the date of opening of bids, half of the deposit will be refunded. The difference between the deposit and the amount refunded represents the cost of reproduction. No refund will be made for documents received after 30 days or in damaged condition. The Owner reserves the right to reject any or all bids and to waive informalities.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents