Similar Projects
John J. Carroll Water Treatment Plant Scada System Improvements - Filed Sub Bids
Bidding
Less than $13,800,000 est. value
Marlborough, MA 01752

Electrical Work
Bidding
Chelmsford, MA

Trade Contractor Prequalification New Fuller Middle School
Post-Bid
Less than $77,935,429 est. value
Framingham, MA 01702

Electric Utility Services for Various Locations
Post-Bid
Marianna, Tallahassee, FL - Jesup, GA - Manchester, Pine Knot, KY - Ayer, MA - Guaynabo, PR - Bennettsville, SC

J--Plumbing and Pipefitting Services BOA
Results
West Haven, CT - Bedford, Boston, Leeds, MA - Augusta, ME - Manchester, NH - Providence, RI - White River Jct, VT

Install Four Pernmanent and Plumbed Eyewash Stations
Results
$25,000 to $100,000 est. value
Hanscom A F B, MA 01731

Plumbing
Bidding
Chelmsford, MA

Construction and Installation of New Stand-By Generator with ATS
Post-Bid
Less than $100,000 est. value
Reading, MA

Uninterrupted Power Supply (UPS) with associated Minimum Essential Characteristics
Results
Natick, MA 01760

Solar PV Maintenance Repairs
Bidding
$18,000 est. value
Hanscom A F B, MA

Water Treatment Plant Ozone and Plant Upgrades - Sub-Bids
Post-Bid
Billerica, MA

Bemis Water Treatment Plant - Filed Sub Bid
Results
Less than $7,400,000 est. value
Pepperell, MA 01463

Automated Metering Infrastructure System
Post-Bid
Groton, MA

Bathroom Upgrades, Cedar Gardens 667-1 and 667-2 - Filed Sub Bids
Results
$498,000 est. value
Natick, MA 01760

Electrical Services for Exterior and Interior School, and Town Owned Facilities
Post-Bid
Dracut, MA

Last Updated 04/16/2020 04:02 PM
Project Title

FA DAY Boiler Replacement and Related Equipment - Filed Sub-Bids

Physical Address View project details and contacts
City, State (County) Newton, MA 02460   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Electric, Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $738,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Labor, supervision and materials to replace the boilers and make related improvements. DCAMM Certification:Required

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents