Similar Projects
General Aviation Area Water System Improvements
Infrastructure
Bidding
Columbus, MS 39701

Gateway Industrial Park Water System
Infrastructure
Bidding
MS

Vicksburg Waterline Protection
Post-Bid
Vicksburg, MS 39180

Long Beach Wastewater System Upgrade
Post-Bid
Gulfport, MS

Graveline Road Utility Relocation Project
Results
$340,098 est. value
Pascagoula, MS 39567

Long Beach Wastewater System Upgrade Phase 2
Results
MS

Contract A Dorothy Street and Depot Street Waterline Replacement and Contract B Industrial Park Well Repairs
Infrastructure
Bidding
Charleston, MS 38921

City of Indianola Utility Relocation
Post-Bid
Indianola, MS

Utility Relocation Project - Graveline Road
Results
$340,098 est. value
Gautier, MS 39553

Project Bulldog Water Utilities
Infrastructure
Bidding
MS

Miscellaneous Services/Repairs Agreement
Post-Bid
Biloxi, MS

Sid Nash Road Infrastructure Improvements
Results
Summit, MS

KUFD Emergency Repair and Replacement Project
Infrastructure
Bidding
Kiln, MS

AMI Water Meters
Term Contract
Post-Bid
Jackson, MS

Northshore Landing Phase 6 Waterline
Results
Brandon, MS

Last Updated 07/13/2021 03:49 PM
Project Title

Contract 1 - Water Distribution System Improvements - Drinking Water System Improvements

Physical Address View project details and contacts
City, State (County) Lucedale, MS   (George County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,923,360
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consisting of the furnishing of materials and labor to construct approximately 30 miles of 2” thru 12” nominal sizes of water mains (147,800 linear feet by open cut methods, 7,250 linear feet by Horizontal Directional Drilling Methods and 1,320 linear feet of ductile iron or HDPE carrier pipes installed inside of casing pipes), approximately 750 linear feet of 12” thru 24” HDPE casing pipe installed by HDD Methods, approximately 440 linear feet of 12” thru 16” steel casing pipes installed by Bore and Jack Methods, approximately 90 gate valves, 16 tapping sleeves with valves, 150 new service connections, reconnection of approximately 55 existing services to new water mains, replacement of 250 existing water meters with automated meters, along with associated work and restoration of disturbed facilities.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents