Similar Projects
Tractor Supply
New Construction - 35,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Bradford, VT

Northside Self Storage
New Construction - 15,050 SF
Conception
$3,398,000 est. value
VT 05201

Retreat Farm Expansion
New Construction, Renovation - 50,000 SF
Design
$15,000,000 est. value
Brattleboro, VT 05301

Storage Facility
Renovation - 17,844 SF
Design
Pownal, VT 05261

DeWitt Block
Renovation, Addition - 19,600 SF
Sub-Bidding
Brattleboro, VT 05301

Northwoods Barn
New Construction - 1,296 SF
Post-Bid
Less than $500,000 CJ est. value
East Charleston, VT 05833

Pole Barn for Milton Drop Off Center
New Construction
Post-Bid
$40,000 est. value
Milton, VT 05468

Salt Shed STP MM19(1)
Results
$500,000 to $1,000,000 est. value
Saint Albans, VT

Transfer Station Pole Barn / Lean to
Results
Castleton, VT

FedEx Ground Distribution Facility
New Construction - 182,000 SF
Construction
$19,548,843 est. value
South Burlington, VT 05403

Booska Worldwide Movers Headquarters
New Construction - 25,560 SF
Construction
$2,478,650 est. value
South Burlington, VT 05403

Traverse Place Warehouse
New Construction
Pending Verification
Rutland, VT 05701

Lake Champlain Transportation Storage And Repair Facilities
New Construction
Pending Verification
Grand Isle, VT 05458

Fleetpride Truck & Trailer Parts Expansion
Addition - 9,632 SF
Conception
Williston, VT 05495

Storage Building
New Construction - 5,400 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Stowe, VT

Last Updated 10/08/2021 04:07 PM
Project Title

Mil Department Bradford Readiness Center Cold Storage Building

Physical Address View project details and contacts
City, State (County) Bradford, VT 05033   (Orange County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $560,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will consist of, but not be limited to, labor and material to construct an approximately 2,000-SF un-heated steel frame storage building using slab-on-grade construction, located on the grounds of the Bradford Readiness Center. Building features metal wall panels, sectional overhead doors and lighting

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents