Similar Projects
I-75 Reconstruction
Infrastructure
Post-Bid
MI

Hot Mix Asphalt Patching
Infrastructure
Post-Bid
Indian River, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

1.96 Mi of Hot Mix Asphalt Reconstruction and Resurfacing, Drainage, Culverts, Concrete Curb and Gutter, Guardrail, Pavement Markings and Signing, Bridge Reconstruction
New Construction, Infrastructure
Results
MI

Straits of Mackinac Tunnel Construction - Great Lakes 5 Pipeline Replacement
Infrastructure
Pending Verification
$500,000,000 CJ est. value
Mackinaw City, MI 49701

Orion Cheboygan Renewable Energy Solar Farm
New Construction, Infrastructure
Pending Verification
$90,000,000 CJ est. value
Cheboygan, MI 49721

Bridge Support - Epoxy and Healer Sealer
Renovation, Infrastructure
Post-Bid

Riggsville Road Kate Hanson Road to VFW Road
Infrastructure
Results
MI

Inverness Oaks Condominium
New Construction, Infrastructure
Pending Verification
$4,080,000 CJ est. value
Cheboygan, MI 49721

Trowbridge Farms Subdivision Gravel Road Chip Seal
Infrastructure
Post-Bid
$500,000 CJ est. value
Trowbridge, MI 49799

North Black River Road Meyers Pit Road to Butler Road
Infrastructure
Results
MI

Wolverine Community Schools Bid Package #1 - 2022 Bond Projects Elementary School & High School Renovations
Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Wolverine, MI 49799

59.04 MI of Hot Mix Asphalt Crack Treatment and Pavement Markings on Various Routes
Infrastructure
Results

Hot Mix Asphalt Reconstruction, Concrete Box Culvert Replacement, Drainage, Sanitary Sewer, Signing and Pavement Markings on US-23
Infrastructure
Post-Bid
$15,746,188 CJ est. value
Cheboygan, MI 49721

3.79 MI of Overband Crack Fill, Single Course Chip Seal with Fog Seal and Pavement Markings on I-75 from North of Riggsville Road Northerly to South of Levering Road
Infrastructure
Results
MI

Last Updated 03/14/2023 06:31 PM
Project Title

I-75 Bridge Approaches

Physical Address View project details and contacts
City, State (County) Indian River, MI 49749   (Cheboygan County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

**As of March 14, 2023, project was not awarded since all the the bids are rejected. The proposed work includes removing and replacing the existing concrete bridge approaches on I-75 NB and I-75 SB over the Indian River, as shown in the details and as directed by the Engineer. The existing concrete curb and gutter, guardrail, and aggregate base will be retained PROJECT LOCATION: The project is located on I-75, approximately 1.43 miles north of M-68, in Tuscarora Township, Cheboygan County, and further described below: I-75 NB / PR: 0550606: Bridge approaches south and north of the I-75 NB bridge over the Indian River, beginning 1 foot south of the HMA/concrete joint on the south side bridge and ending 1 foot north of the HMA/concrete joint on the north side of the bridge: DESCRIPTION CS 16091 MP POB to POE 16.523 - 16.585 LENGTH 0.062 miles I-75 SB / PR: 0550607: Bridge approaches north and south of the I-75 SB bridge over the Indian River, beginning 1 foot north of the HMA/concrete joint on the north side bridge and ending 1 foot south of the HMA/concrete joint on the south side of the bridge: DESCRIPTION CS 16091 MP POB to POE 16.579 - 16.641 LENGTH 0.062 miles Bidders must be prequalified in MDOT miscellaneous concrete work All work must be completed in accordance with the Michigan Department of Transportation 2020 Standard Specifications for Construction. All work specified will be paid as a Lump Sum. Project Start Date: After all Contracts are executed. Project Completion Date: By May 26th, 2023 Contractor shall coordinate all work with Cheboygan County Road Commission ProjectManager, Ruby Solario, (231) 420-1158, engtech@chcrc.com

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents