Similar Projects
Jordan Road - Roadside Improvements - Hess Road to Bradbury Parkway
Infrastructure
Bidding
$200,000 est. value
Parker, CO 80138

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

2021 Community Roadwork
Infrastructure
Post-Bid
Highlands Ranch, CO 80126

Peoria Street Widening Project
Results
Less than $1,058,887 est. value
Castle Rock, CO

2020 Road Repair Project
Results
Castle Rock, CO 80108

2021 Woodmoor Mountain Road Project
Infrastructure
Post-Bid
CO

Canyons Filing 1 3rd Amendment Storm Roadways Water and Sanitary
Results
Lone Tree, CO

2021 Miscellaneous Concrete Replacement Project
Infrastructure
Post-Bid
Castle Rock, CO

2021 Townwide Resurfacing Program
Results
Parker, CO

CMGC services for the Crystal Valley Interchange Project
Renovation, Infrastructure
Post-Bid
Castle Rock, CO

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

2022 Asphalt Overlay Project
Infrastructure
Post-Bid
Castle Rock, CO

2021 Street Overlay
Results
Lone Tree, CO

2022 Slurry Seal Project
Infrastructure
Post-Bid
Castle Rock, CO

2021 Asphalt Overlay
Results
Less than $3,987,537 est. value
Castle Rock, CO

Last Updated 04/19/2022 02:46 AM
Project Title

Plum Creek Parkway Widening Phase 2

Physical Address View project details and contacts
City, State (County) Castle Rock, CO 80108   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract includes roadway widening of Plum Creek Parkway from Eaton Street to Ridge Road including modifications to the roundabout and approaches at the intersection of Plum Creek Parkway and Ridge Road. The work for this contract generally includes removals of existing pavements; installation of new storm drain pipe, inlets and manholes; grouted rip rap channel installation; grading/earthwork, retaining wall construction, construction zone traffic control, erosion control installation and maintenance, hot mix asphalt placement, striping, and sign installation. The Contractor shall supply all labor, materials and equipment necessary to complete the work in accordance with these specifications. The contractor shall complete the work by June 30th, 2023. The Notice to proceed date is estimated to be May 18th, 2022. If “Construction Completion” is not issued by the Towy by the Completion Date of June 30, 2023, “Liquidated Damages” shall be assessed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents