Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

LED Lamps
Post-Bid
Huntsville, TX

Generator and Transfer Switch
Post-Bid
Huntsville, TX 77342

Unit Price Contract for Electrical Services
Results
Less than $100,000 est. value
Huntsville, TX 77340

Hot Water Generator
Results
Less than $20,296 est. value
Huntsville, TX

Electrical Distribution Upgrades
Post-Bid
Huntsville, TX

Install Generator and ATS - B Dorm
Results
Less than $60,308 est. value
Huntsville, TX 77342

5D4m-Replace Hospital Power Lines
Post-Bid
$25,000 to $100,000 est. value

Electrical Wire
Results
Huntsville, TX

Transformer Testing and Maintenance on Switching Blades
Post-Bid
Falcon Heights, TX

Light Emitting Diode (LED) Lamps for the Facilities Central Warehouse
Results
Huntsville, TX 77320

Facility A/C Bacnet Repair
Post-Bid

JBSA Door Lock BPA
Term Contract
Results

Purchase, Installation and Relocation of Emergency Standby Generator No. 21-13
Alteration
Post-Bid
Huntsville, TX 77340

LED Lamps for the Facilities Central Warehouse
Alteration
Results
$74,340 est. value
Huntsville, TX

Reported 12/01/2021 12:00 AM
Project Title

Installation of Metal Sheets, Columns, Doors and Relocation of Electrical Switch and Plug

Physical Address View project details and contacts
City, State (County) Huntsville, TX 77340   (Walker County)
Category(s) Single Trades
Sub-Category(s) Electric, Windows/Doors
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. The existing building is 63’ x 30’ on a concrete slab. The structure already has metal roof with partial metal walls coming down from the roof. 2. Relocate electrical switch and outlet plug on the south end of the building. City staff will provide exact location during site visit. 3. Install tan R Panels and trim, to match existing panels, on existing exterior walls and transition parts, to enclose the building down to the concrete slab. 4. Add 8” galvanized purlin at 48” with base angle and trim angle. 5. Add galvanized columns for the walk-through 40” metal door as well as a 10ft roll up metal door, to be provided and installed by the contractor on the west side of the building. City staff will provide exact location during site visit. 6. Add galvanized purlin for walk through 40” metal doors, provided by contractor, on the south and east side of the building. City staff will provide exact location during site visit. 7. Clean area and dispose of all materials. 8. Walk through metal door colors will need to match the color of the paneling. 9. Turnkey project.

Details

Division 08 - Openings, Doors and Frames, Windows.
Division 26 - Electrical, Transfer Switches.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents