Similar Projects
Kisker And Route 364 Self Storage
New Construction, Infrastructure - 124,032 SF
Conception
$14,000,000 CJ est. value
Saint Peters, MO 63376

Lowe's Tool Rental Expansion
Addition, Demolition, Infrastructure - 3,196 SF
Design
$1,200,000 CJ est. value
Saint Charles, MO 63301

Tidal Wave Car Wash / St Peters
New Construction, Infrastructure - 5,400 SF
Design
$1,400,000 CJ est. value
Saint Peters, MO 63376

Wright City East Elementary School Addition
Addition, Demolition, Infrastructure - 5,300 SF
Bidding
$1,600,000 CJ est. value
Foristell, MO 63348

Wolfrum Road Trail Extension
Infrastructure
Bidding
$250,000 CJ est. value
Weldon Spring, MO 63304

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

Parks Asphalt Paving
Infrastructure
Post-Bid
Foristell, MO 63348

Pavement Sealing and Striping of Justice Center and Water Treatment Facilities Parking Lots
Results
Saint Peters, MO

Great Oaks Turn Lane Addition
Infrastructure
Results
Wentzville, MO

Technology Drive / Multi-Residential
New Construction, Infrastructure
Construction
$54,000,000 CJ est. value
Lake Saint Louis, MO 63367

Reserve at St. Peters
New Construction, Infrastructure
Pending Verification
$53,000,000 CJ est. value
Saint Peters, MO 63376

The Chabad Jewish Center / St Charles County
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cottleville, MO 63366

Little Sunshine's Playhouse & Preschool
New Construction, Infrastructure - 11,354 SF
Design
$2,000,000 CJ est. value
Lake Saint Louis, MO 63367

Busch (August A) Mem CA Lake 33 and 34 Floating Dock Replacement
Infrastructure
Bidding
$55,000 CJ est. value
Augusta, MO 63332

Asphalt Removal and Replacement
Infrastructure
Post-Bid
Cottleville, MO

Last Updated 11/16/2022 01:03 AM
Project Title

Grading, Pavement, and Drainage

Physical Address View project details and contacts
City, State (County) New Melle, MO 63365   (Saint Charles County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $136,577 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J6M3419 Route D ST CHARLES County. Grading, pavement, and drainage west of Route F in New Melle, the total length of improvement being 0.043 miles. Range: 100K to 250K Each Bid Shall Be Accompanied by a Certified Check or Cashier's Check, Drawn on Any Bank or Trust Company and Payable to "Director of Revenue, Credit State Road Fund", or Bidders May Submit a Bid Bond for Each Project Bid or an Annual Bid Bond That Would Cover All Projects Bid for a Twelve Month Beginning July 1 and Ending June 30 of Each Missouri State Fiscal Year. Annual Bid Bond Forms Must Be Submitted by June 15 of Each Year. Bid bonds must be Submitted on a form furnished by the commission, executed by the bidder and corporate surety, and naming the "State of missouri, acting by and Through the missouri highways and transportation commission", as obligee) for an amount (or penal sum) equal to 5% or more of the bid, Which check or bond shall be deposited with the commission as a guaranty and forfeited in the event the bidder is found to be the successful bidder and fails to comply with the terms of the request for bid. The Missouri Highways and Transportation Commission Hereby Notifies All Bidders That It Will Affirmatively Insure That in Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, Religion, Creed, Sex, Age, Ancestry, or National Origin in Consideration for an Award. The Right Is Reserved by the Missouri Highways and Transportation Commission to Reject Any or All Bids. Any Contractor Who Desires to Bid on the Project(S) Involved in the Bid Opening Must Have a Contractor Questionnaire on File in the Office of the Missouri Highways and Transportation Commission at Least Seven Full Days (168 Hours) Prior to the Time of Bid Opening. A New Contractor Questionnaire Must Be Filed Annually Except That the Commission May Request a New Questionnaire at Any Time. MODOT - F03 - Grading, Pavement, and Drainage *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents