Similar Projects
Reported | 11/04/2021 12:00 AM |
Project Title | 6" PE Extension of Natural Gas Facilities to Serve the Bluffs on Thompson Creek and Surroundings Areas |
Physical Address | View project details and contacts |
City, State (County) | Saint Francisville, LA (West Feliciana County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Fuel/Chemical Tanks and Lines |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For installing approximately 9,600 linear feet of 6” PE coiled pipe and 4,200 linear feet of 4” PE coiled pipe for the purposes of extending a natural gas distribution system mains and services to the Bluffs Subdivision. The project also requires crossing of the Texas Eastern Transmission Pipelines at two (2) separate locations, and several HDD creek bores along Highway 965 and Freeland Road. Included in the new gas distribution system is the installation of 6” and 4” PE ball valves, necessary road bores and obstruction bores. |
||||||||||||||
Details |
|
||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |