Similar Projects
Technology Place Street Extension - TR0120 - City of Norman
Infrastructure
Conception
$550,000 CJ est. value
Norman, OK 73071

Effluent Truck Wash Facility - SA0015 - City of Norman
Infrastructure
Conception
$492,950 CJ est. value
Norman, OK 73069

Grade, Drain and Surface - IS 35
Infrastructure
Design
$10,000,000 CJ est. value
Norman, OK 73069

Grade, Drain and Surface - IS 35
Infrastructure
Design
$10,000,000 CJ est. value
Norman, OK 73069

District 2 Luther Road Bridge Repair (N Canadian River & Railroad Bridge)
Infrastructure
Bidding
$3,000,000 CJ est. value
Oklahoma City, OK 74857

Lake Thunderbird Access
Infrastructure
Bidding
$5,000,000 CJ est. value
Norman, OK 73026

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Porter Avenue Waterline Replacement Phase II
Infrastructure
Results
Norman, OK

Moore Animal Shelter - Bid Package #1
New Construction, Infrastructure - 47,629 SF
Results
$6,492,069 CJ est. value
Moore, OK 73160

Summit Valley Interceptor - City of Norman
Infrastructure
Pending Verification
$284,600 CJ est. value
Norman, OK 73069

Summit Valley Interceptor - City of Norman
Infrastructure
Pending Verification
$284,600 CJ est. value
Norman, OK 73069

I-44 - Utilities
Infrastructure
Conception
$885,851 CJ est. value
Norman, OK 73026

Utilities - US 77
Infrastructure
Design
$1,250,000 CJ est. value
Noble, OK 73068

Test Holes and New Water Supply Well (17)
Infrastructure
Bidding
$400,000 CJ est. value
Lexington, OK 73051

Last Updated 03/31/2023 12:04 AM
Project Title

Utilities - SH 9

Physical Address View project details and contacts
City, State (County) Norman, OK 73071   (Cleveland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $550,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-9: Begin at the East End of Little River Bridge, Extend East Approx4.55 Miles to Pecan Creek Bridge (Ut for 32758(04) As of March 31, 2023, the project is in Final Planning status. Anticipated letting month/year is March, 2023. Length : 4.550 Mi OKDOT - Utilities - SH 9 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents