Similar Projects
Road Rehabilitation Phase 2 and Sidewalk Replacement
Infrastructure
Bidding
Keene, NH

Paving of Sidewalks Adjacent to Taylor Way
Infrastructure
Bidding
$400,000 est. value
Wakefield, NH 03872

Driveway Sealing and Striping
Post-Bid
Madison, NH 03849

Acquisition and Development of Pearl Street Parking Lot
Infrastructure
Post-Bid
Manchester, NH 03104

Whittier Street Sidewalk Improvements
Results
Dover, NH

Cheshire Rail Trail III Loop Project
Results
Less than $306,636 est. value
Keene, NH

Keene Housing Site Improvements - Multiple Locations
Renovation
Construction
Keene, NH

Pavement Markings - Crosswalks, Symbols and Parking Lots
Infrastructure
Bidding
$100,000 est. value
Keene, NH

Acquisition and Development of Hartnett Parking Lot
Infrastructure
Post-Bid
Manchester, NH

Wason Pond Community Center Ramp
Results
Chester, NH 03036

New Hampshire Farm Museum Parking Lot
Alteration
Post-Bid
Milton, NH 03851

Walkway Treatment
Results
Boscawen, NH

Police Station Parking Lot Expansion
Infrastructure
Post-Bid
Lebanon, NH 03766

2021 Sidewalk Improvements
Term Contract
Results
Dover, NH

Development Partnership with the City of Portsmouth for the Federal McIntyre Property
New Construction - 107,000 SF
Post-Bid
Portsmouth, NH 03801

Last Updated 04/13/2022 10:25 AM
Project Title

Sidewalk Curb Ramp Replacement

Physical Address View project details and contacts
City, State (County) Nashua, NH   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the reconstruction of pedestrian sidewalk ramps and landings on Summer Street, Berkeley Street, and Harris Road to ADA standards. Work shall include new and reset granite curbing with new concrete sidewalk ramps and landings on Summer Street and Berkeley Street, and with new asphalt sidewalk ramps and landings on Harris Road. The work shall also include adjustment to drainage structures and traffic signs within the sidewalk ramp and landing work areas.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents