Similar Projects
Slc Airport Economy Parking Lot Bus Route Reconfiguration
Bidding
Salt Lake City, UT

Magna 8950 W Sidewalk from 2800 S To 2700 S
Bidding
$160,000 to $260,000 est. value
Salt Lake City, UT

BRHS Natatorium Parking Lot Expansion
Sub-Bidding
Brigham City, Garland, Tremonton, UT 84312

New Parking Lot and Elevated Parking Deck Adjacent to City Hall
Post-Bid
Saint George, UT 84770

2020 Provo City Sidewalk Replacement Project
Post-Bid
Provo, UT

Mesa Drive Sidewalk
Results
$170,000 to $225,000 est. value
Salt Lake City, UT 84190

Elton Park Sidewalk Project
Results
Less than $60,000 est. value
Tooele, UT 84074

DFCM Construction - Pre Qualified Paving Contractors - Utah State Board of Education Accessible Parking Upgrades
Bidding
$1 to $110,000 est. value
Salt Lake City, UT 84111

Construction of the Santa Clara Lava Flow Trail
Post-Bid
Santa Clara, UT 84765

USU Spectrum Parking Lot Phase I
Results
Logan, UT 84322

Moonshine Arch Trailhead Improvements Non-Urban
Bidding
$500,000 est. value
UT

Asphalt Preservation in Parking Lots for Senior Center
Post-Bid
Price, UT 84501

SR-284; Weber State Preservation High Volume
Results
$500,000 to $1,500,000 est. value
UT

300 East - 3900 South to 3970 South
Bidding
Millcreek, UT

Asphalt Preservation in Parking Lots for RC Airport
Post-Bid
Price, UT 84501

Last Updated 03/11/2021 11:09 AM
Project Title

DFCM Construction-Pre-Qualified General Contractors-Ogden Reg. Ctr. Sidewalks/Approaches-21267310

Physical Address View project details and contacts
City, State (County) Ogden, UT   (Weber County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $173,397
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The brick pavers installed on Ogden avenue and Washington Blvd are heaving due to moisture. This has created many tripping hazards. These will be removed and replaced with concrete and stamped concrete. Street trees on Ogden Avenue will be replaced. Curb and gutter along Washington Blvd. will be replaced.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents