Similar Projects
Last Updated | 06/19/2023 05:32 AM |
Project Title | SR 590 Pipes |
Physical Address | View project details and contacts |
City, State (County) | Greeley, PA 18425 (Pike County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,244,444 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | For the Improvement of a Certain Section of State Route 0590, Sec 401 in Pike County, Lackawaxen Township. The Location of the Project is as Follows: From a Point on Sr 0590 at Segment 0120 Offset 0672 (Sta 283+50) to a Point Approximately 328 Feet Along Sr 0590 at Segment 0130 Offset 0201 (Sta 290+50) and From a Point on Sr 0590 at Segment 0130 Offset 0601 (Sta 294+50) to a Point Approximately 355 Feet Along Sr 0590 at Segment 0130 Offset 1101 (Sta 299+50), With a Total Work Area Length of 682.75 Feet (0.129 Miles). The West Culvert Consists of a 64"X36" Squashed Cmp Culvert With Stone Headwalls and Wingwalls. The Existing Structure Will Be Replaced With a 72" Corrugated Metal Pipe Culvert With Precast Concrete Endwalls. The Approach Roadway Work Will Extend Approximately 165 to the South and 115 to the North of the Pipe. Traffic Will Be Maintained via an Approved Three (3) Day Roadway Closure and Detour. The East Culvert Consists of Three (3) 36" Diameter Cmp Culverts Carrying Sr 0590 Over West Falls Creek With Stone Headwalls. The Existing Structure Will Be Replaced With a 12-0 X 3-6 Single Cell Precast Concrete Box Culvert With Precast Concrete End Sections. The Approach Roadway Work Will Extend Approximately 75 to the West and 120 to the East of the Culvert. Traffic Will Be Maintained via an Approved Seven (7) Day Roadway Closure and Detour. Other Work Includes Excavation, Full Depth Bituminous Paving, E & S Control Measures, Drainage, Guiderail, Landscaping, Temporary Traffic Control, Signing, Pavement Markings, Culvert Removal, and Other Miscellaneous Construction Work. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 33.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Bridge Replacement PennDOT - SR 590 Pipes *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |