Last Updated | 06/27/2023 06:09 AM |
Project Title | GMNF FR59-4.9 Culvert Replacement |
Physical Address | View project details and contacts |
City, State (County) | Ripton, VT 05766 (Addison County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | Agency's Affiliate - 05/05/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is located in is located in the Green Mountain National Forest in Ripton, VT, in Addison County and is for the replacement of the culvert located on Forest Road 59 at milepost 4.9. The culvert replacement work shall include, shall include, but is not limited to, excavation, removal of existing culvert, layout and construction of the plate arch, construction of concrete substructures, stream simulation, roadway reconstruction, and approach work. The Contractor shall utilize a Government-furnished plate arch. The Contractor shall furnish all new hardware for the plate arch. This Invitation For Bids (IFB) is a Total Small Business set-aside. The magnitude of this project is considered moderate with an estimated price range of between $250,000 and $500,000. Please send all questions to the Contract Specialist, Michael Winstead, at michael.winstead@usda.gov no later than May 22, 2023. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Forest Road 59 - 4.9 Culvert Replacement Contract work shall include, but is not limited to, excavation, removal of existing culvert, layout and construction of the plate arch, construction of concrete substructures, stream simulation, roadway reconstruction, and approach work. The Contractor shall utilize a Government-furnished plate arch. The Contractor shall furnish all new hardware for the plate arch. See Attachment 2 for additional details. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |