Similar Projects
Y1da--Add AHU Metering Louis Stokes VAMC
Design
$1,000,000 to $5,000,000 est. value
Cleveland, OH 44106

The Federal Aviation Administration Logistic Center (FAALC) Requires Drainage Upgrade Around the Cleveland Air Traffic Control Tower Facility and the Replacement of Three Facility Chiller Pumps
Post-Bid
$25,000 to $100,000 est. value
Cleveland, OH 44114

HVAC and Mechanical Products
Term Contract
Post-Bid

Public Auditorium Music Hall Air Handling Units
Results
$950,000 est. value
Cleveland, OH 44114

Recreation Center - Lobby and Gym HVAC Modifications
Results
Less than $210,000 est. value
Cleveland, OH 44115

HVAC Cleveland Coast Guard
Post-Bid
Cleveland, OH 44114

Chiller Replacement at Cedar Extension High Rise
Results
Cleveland, OH 44104

HVAC Technical Services for Forced Air Furnaces
Term Contract
Post-Bid
Cleveland, OH

District Wide HVAC Building Automation System Upgrades (1589)
Results
$473,209 est. value
Cleveland, OH 44115

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Wolstein Cooling Tower Repair Phase 1
Results
Cleveland, OH 44115

Twinsburg Maintenance Facility HVAC and Miscellaneous Improvements
Alteration
Post-Bid
Cleveland, OH

HVAC Preventive Maintenance, HVAC Water Treatment Service, and Building Automation System Monitoring
Term Contract
Results
$150,336 est. value
Lakewood, OH 44107

HVAC & Facility Systems, Automation, Installation, Service and Related Products & Services in Ohio
Term Contract
Post-Bid

Y--Replacement of AHU-17 & AHU-18 LOUIS STOKES VAMC - CLEVELAND, OH 44106 541-18-104
Results
$5,000,000 to $10,000,000 est. value
Cleveland, OH

Reported 01/20/2022 12:00 AM
Project Title

East Professional Building Roof Top Unit and Garage Air Intake Replacement Project

Physical Address View project details and contacts
City, State (County) Cleveland, OH 44103   (Cuyahoga County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

East professional building has three roof top units in need of replacement. Units number 10, 11 and 12 have exceeded their life expectancy and are no longer functioning properly. The Garage fresh air intake also needs to be replaced and is no longer functioning. RTU: 10, 11, 12: • Remove antiquated RTU’s and supply rigging for removal. • Install new RTU’s with new curb adapter. • Replace electrical disconnects and wiring from the Disconnect to the unit. • All replaced units must work properly when the job is finished. A walkthrough will be conducted verifying the operation of all units installed. • Custodial staff will need to be in serviced on the operation and maintenance of the newly installed units. Garage Air Intake Unit: • Remove block wall • Disconnect old unit and remove • Replace the electrical disconnect and wire from the disconnect to the unit • reconnect duct, gas line, and electrical • Replace block wall • A walkthrough will be conducted verifying the correct operation of the unit.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents