Similar Projects
Variable Frequency Drive Replacement, National Airport
Bidding
Less than $30,000 est. value
Arlington, VA

Conmy Hall Lighting and Audio Upgrade
Post-Bid
Arlington, VA 22211

Uninterruptible Power Supply Systems (UPS)
Post-Bid
Arlington, VA 22350

Advanced Contract Initiative (ACI) Temporary Emergency Power (TEMP)
Results

Wallpack and Flood Light LED
Term Contract
Results
Less than $100,000 est. value
VA

DODEA Americas UPS Upgrade and Warranty Services
Post-Bid

Central Plant Generator Tube Replacements
Term Contract
Results
Less than $500,000 est. value
Arlington, VA 22202

62--VACO Studio Lighting Upgrade - B/V (VA-19-00054421)
Post-Bid
Arlington, VA 22202

Cobra LED Luminaires
Results
Less than $100,000 est. value
VA

On-Call Basis Luminaires for Arlington County
Post-Bid
VA

Replacement of Variable Frequency Drives at Ronald Reagan Washington National Airport
Results
Less than $50,000 est. value
Arlington, VA

80KW Standby Power System at Ronald Reagan Washington National Airport
Results
Arlington, VA

Terminal A Banjo Electrical Switchgear Systems Replacement, National Airport
Results
$2,500,000 to $5,000,000 est. value
Arlington, VA 22202

Statewide on Call Electrical Repairs
Term Contract
Results
Richmond, VA 23269

Replace Motor Control Centers
Results
$850,000 est. value
Arlington, VA 22202

Last Updated 10/04/2019 09:34 AM
Project Title

Design/Build Relocation of Airfield Transformer Vault 900, National Airport

Physical Address View project details and contacts
City, State (County) Arlington, VA 22202   (Arlington County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description 50% LDBE participation requirement Provide Design-Build services for the relocation of Airfield Transformer Vault (TV-900) to enhance airfield safety, address non-standard geometry and to improve the runway 1 Hold Apron spacing at Ronald Reagan Washington National Airport
Details
Division 26 - Electrical.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents