Similar Projects
Last Updated | 09/09/2021 02:28 PM |
Project Title | Rehabilitation of Multi-Plate Pipe Under Route 104 at Intersection of Corliss Hill Road |
Physical Address | View project details and contacts |
City, State (County) | Meredith, NH (Belknap County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $386,220 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Meredith 42912 Culvert Rehabilitation 202.42 Removal Of Existing Pipe Over 24" Diameter Lf 10.00 203.11 Common Excavation - Lrs Cy 15.00 203.601 Embankment-In-Place Cy 40.00 206.19 Common Structure Excavation Exploratory Cy 5.00 209.1 Granular Backfill Cy 45.00 503.101 Water Diversion Structure u 1.00 512.02 Preparation For Concrete Repairs, Class Ii Sy 1.00 520.01 Concrete Class Aa Cy 1.00 520.32 Grouting Voids In Backfill Material Cy 10.00 583.002 Reset Existing Riprap Sy 10.00 602.011 Fill Material For Annular Space Cy 55.00 602.24290 Corrugated Metal Tunnel Liner For 90" Pipe Lf 178.00 618.61 Uniformed Officers With Vehicle $ 12,000.00 618.7 Flaggers Hr 500.00 619.1 Maintenance Of Traffic u 1.00 619.25 Portable Changeable Message Sign u 2.00 619.279 Automated Trailer-Mounted Speed Limit Sign u 2.00 632.1104 Preformed Retroreflective Tape, Type i (Removable) 4" Line Lf 2,000.00 644.22 Shrub/Forest Wetland Seed Mix Lb 5.00 645.3 Erosion Stone Ton 40.00 645.44 Temporary Slope Matting Type d (Wildlife Friendly) Sy 220.00 645.512 Compost Sock For Perimeter Berm Lf 600.00 645.531 Silt Fence Lf 650.00 645.7 Storm Water Pollution Prevention Plan u 1.00 645.71 Monitoring Swppp And Erosion And Sediment Controls Hr 100.00 645.72 Final Wetland Impact Report u 1.00 646.41 Turf Establishment With Mulch, Tackifiers And Humus Sy 220.00 670.0491 Construct And Remove Temporary Access Road u 1.00 670.0492 Construct And Remove Temporary Access Roadu 1.00 692. Mobilization u 1.00 697.31 Project Operations Plan u 1.00 699. Miscellaneous Temporary Erosion Andsediment Control$ 3,000.00 1010.15 Fuel Adjustment $ 2,000.00 |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |