Similar Projects
Court Building & Residential Building
New Construction - 61,000 SF
Design
New Rochelle, NY 10801

Regeneron Pharmaceuticals Phase II
New Construction - 586,000 SF
Design
$800,000,000 est. value
East Greenbush, NY 12061

Battery Enclosure & CryoEm Center
Renovation
Post-Bid
Buffalo, NY 14203

New York State Life Sciences Public Health Laboratory
New Construction
Results
$750,000,000 est. value
Albany, Rensselaer, NY 12207

New York State Life Sciences Public Health Laboratory
New Construction
Results
$750,000,000 est. value
Albany, Rensselaer, NY 12207

Dimock Lab Renovation for Golden Nematode
Renovation
Construction
$1,500,000 to $1,700,000 est. value
Ithaca, NY 14850

Upson Hall Rooms 354 & 358 Laboratory Fit-Out
Renovation
Construction
$140,000 to $150,000 est. value
Ithaca, NY 14853

BioTech Shell Buildings
New Construction - 97,000 SF
Pending Verification
$38,000,000 est. value
Ardsley, NY 10502

Groundwork Market Garden
Renovation
Pending Verification
$3,711,902 est. value
Buffalo, NY 14211

Lock 7 Affordable Housing
New Construction
Design
Oswego, NY 13126

Barton Lab - AHU HV-2 Replacement
Renovation
Results
$80,000 to $100,000 est. value
Geneva, NY 14456

Center for Science & Technology Labs @ Syracuse University
Renovation
Construction
Syracuse, NY 13210

Entrepreneurship Center & Makerspace Lab
Renovation
Pending Verification
$2,400,000 est. value
Syracuse, NY 13214

RMC Bio1 Laboratory & Offices
New Construction
Design
Hawthorne, NY 10532

Wilson Synchrotron Laboratory SLAC Power Supply and Autotransformer Installation
Renovation
Results
$350,000 to $375,000 est. value
Ithaca, NY 14853

Last Updated 02/08/2019 09:53 AM
Project Title

Physical Sciences Building Chemistry Lab Fit-Out

Physical Address View project details and contacts
City, State (County) Ithaca, NY 14853   (Tompkins County)
Category(s) Laboratory
Sub-Category(s) Laboratory
Contracting Method General Contractor to Subcontract.
Project Status Construction Commenced October 2018, Construction Complete as of January 2019
Bids Due View project details and contacts
Estimated Value $388,900
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Renovate existing lab space on the ground and second floors of Physical Sciences Building (PSB). Spaces to be renovated include PSB G41, G48 and 251. Install walk-in cold room in G48, autoclave units in 251, new casework, moveable work tables and lab equipment. Mechanical, electrical and plumbing modifications and extensions to support new lab equipment including the walk-in cold room and autoclave units. Install new utility access door in G48 to access the cold room remote condensing unit and the infill of an existing opening in a 1-hour rated wall in 251 and providing a rated door at that infill.
Details Laboratory, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents