Similar Projects
Resurface Hangar Floors
Term Contract
Design
$250,000 to $500,000 est. value
Eastover, SC

JS Penthouse Flooring
Alteration
Bidding
Columbia, SC 29201

Flooring Repair and Waterproofing
Alteration
Bidding
Marietta, SC 29661

Hardwood Synthetic Sports Flooring
Post-Bid

Hardwood Synthetic Sports Flooring
Post-Bid

Carpet and Tile Replacement at Carlisle-Foster's Grove Elementary
Results
Chesnee, SC 29323

Rubber Flooring Coating
Results
Charleston, SC 29404

Kershaw County Lab Upfits
Construction
$150,000 to $180,000 est. value
Camden, SC

SCGSAH Sprung Floor Addition
Alteration
Bidding
$30,000 to $32,000 est. value
Greenville, SC 29601

S214--4W Flooring
Post-Bid
Columbia, SC

NAVCON Brig Carpet Replacement
Results
North Charleston, SC 29406

Clifdale Middle Flooring Replacement
Post-Bid
Spartanburg, SC 29307

Resurfacing Gym Floors
Results
Aiken, SC 29801

Transfer Station Tipping Floor Repairs
Post-Bid
Lancaster, SC

Provision and Installation of Flooring in Human Services Building
Results
Summerville, SC 29477

Reported 12/18/2021 12:00 AM
Project Title

Detention Center Rehabilitation Project - Flooring

Physical Address View project details and contacts
City, State (County) Lexington, SC 29072   (Lexington County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Flooring of the Detention Center Facilities. LOCATIONS: A. DORMS (2) 1. (4) Living Areas (sitting rooms, sleeping quarters, holding cells and officer’s towers) 2. Demolition of existing VCT 3. Supply and installation of VCT NOTE: Removal and re-installation of beds is required. NOTE: All floor prep should be to manufacturer's recommendation. B. (4) Bathroom Areas 1. Demolition and installation of floor up to 2 inch, new slope underlayment, new 1/8” epoxy decorative quartz flooring system, refinish mop sinks, sand walls and coat walls with epoxy. 2. HARD PODS (3) a. Living Area 1. Removal of carpet and existing flooring, prep and installation of clear epoxy 100% solids flooring. NOTE: Removal and re-installation of beds is required. NOTE: All floor prep should be to manufacturer's recommendation. b. Bathroom Area 1. Demolition and installation of floor up to 2 inch, new slope underlayment, new 1/8” epoxy decorative quartz flooring system, refinish mop sinks, sand walls and coat walls with epoxy. 3. SOFT PODS (4) A. Living Area 1 Removal of carpet and existing flooring, prep and installation of clear epoxy 100% solids flooring. NOTE: Removal and re-installation of beds is required. NOTE: All floor prep should be to manufacturer's recommendation. B. Bathroom Area 1. Demolition and installation of floor up to 2 inch, new slope underlayment, new 1/8” epoxy decorative quartz flooring system, refinish mop sinks, sand walls and coat walls with epoxy.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents