Similar Projects
Ellsworth - Baldwin Construction / Resurface
Infrastructure
Conception
$7,000,000 CJ est. value
Ellsworth, WI 54011

Ellsworth - Baldwin Construction / Resurface
Infrastructure
Conception
$7,000,000 CJ est. value
Ellsworth, WI 54011

DeSanctis Park Villas
New Construction, Infrastructure
Design
$16,500,000 CJ est. value
River Falls, WI 54022

DeSanctis Park Villas
New Construction, Infrastructure
Design
$16,500,000 CJ est. value
River Falls, WI 54022

2022 Road Pavement Maintenance Work
Infrastructure
Post-Bid
$200,000 est. value
River Falls, WI

East Hill Paving
Infrastructure
Post-Bid
$500,000 est. value
Plum City, WI

Prescott Riverfront Improvement
Infrastructure, Alteration
Results
Prescott, WI

Kinne Street Water Main
Infrastructure
Results
$180,000 est. value
Ellsworth, WI 54011

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Radio Road Apartments
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
River Falls, WI 54022

Radio Road Apartments
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
River Falls, WI 54022

Court Street Mill and Overlay - City of Prescott
Infrastructure
Conception
$279,200 CJ est. value
Prescott, WI 54021

Prescott - Ellsworth Constr / Culvert Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Ellsworth, WI 54011

Pierce County Campus - Parking Lot Sealcoating and Striping Project
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Ellsworth, WI 54011

Last Updated 07/22/2023 08:01 AM
Project Title

HMA Pavement - STH 035

Physical Address View project details and contacts
City, State (County) Prescott, WI 54021   (Pierce County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,055,507 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

20230711008 7180-00-79 Base, HMA Pavement, Curb and Gutter, Sidewalk, Storm Sewer, Pavement Marking, Street Lighting. Work Type: AK DBE Goal: 0% Working Day Contract: 40 Days With each sealed proposal, the bidder must include a properly executed bid bond or a cashiers check, certified check, banks check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. WI DOT - 008 - Pepin - Hager City - USH 63 Intersection STH 035

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents