Similar Projects
Nelson Property Group Residential
New Construction - 7,400 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Rock Hill, SC

New Gray Rock Road Water Main Extension
Infrastructure
Design
$2,000,000 CJ est. value
Tega Cay, SC 29708

New Gray Rock Road Water Main Extension
Infrastructure
Design
$2,000,000 CJ est. value
Tega Cay, SC 29708

S-49 (Sutton Road ) and S-251 (New Gray Rock Road) Intersection Improvements
Infrastructure
Bidding
$2,400,000 CJ est. value
York, SC 29745

Sunflower Springs / Lake Wylie
New Construction, Infrastructure - 63,463 SF
Bidding
$17,000,000 CJ est. value
Clover, SC 29710

Remote Disconnect Meters (RDM) Meter Installation Project
Infrastructure
Sub-Bidding
$170,000 CJ est. value
Fort Mill, SC 29715

Remote Disconnect Meters (RDM) Meter Installation Project
Infrastructure
Sub-Bidding
$170,000 CJ est. value
Fort Mill, SC 29715

On-Call Water and Sewer Line Repair, Replacement and/or Rehabilitation Services
Infrastructure
Post-Bid
Rock Hill, SC

Genthe Court Extension
New Construction
Post-Bid
SC

Advanced Metering Infrastructure (AMI) Meter System
Term Contract
Results
York, SC

US 321/Kings Mountain Road Intersection
Results
$2,000,000 est. value
York, SC 29745

East Water Meter
Alteration
Post-Bid
York, SC

Highway 274 Force Main Replacement
Infrastructure
Results
SC

Boiler-Chiller Underground Water Line Replacement
Alteration
Post-Bid
$500,000 to $650,000 est. value
Rock Hill, SC 29730

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Last Updated 07/26/2022 11:06 AM
Project Title

Willow Oaks Water System Improvements

Physical Address View project details and contacts
City, State (County) Clover, SC 29710   (York County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $194,395 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of water service connections for Willow Oaks apartment complex. This CDBG Project includes replacement of 48 residential water laterals and meters and installation of 5 fire hydrants. Non-CDBG work will include replacement of 2 non-residential laterals and meters. Construction Cost Range: $250,000 - $300,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Distribution Fire Hydrants, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents