Similar Projects
Service Line Replacement Program - FY21
Infrastructure
Bidding
$926,750 est. value
Henderson, NV 89002

Waterline Improvements for California Avenue
Infrastructure
Bidding
$312,897 to $382,429 est. value
Reno, NV 89509

Brunswick Transmission Main Repair
Post-Bid
Carson City, NV

Airport Waterline Replacement Labor Commission Project
Infrastructure
Post-Bid
Mesquite, NV

Hollywood System Centennial To Speedway #2 Detention Basin
Results
$9,000,000 to $9,500,000 est. value
North Las Vegas, NV 89031

Kings Row Fire Flow Upgrades
Results
$153,900 to $188,100 est. value
Reno, NV

Water Main Replacement Project for G Street and Shriver Boulevard
Results
$338,962 to $414,286 est. value
Reno, NV

Maryland Campus Vault Repairs
Results
$150,000 est. value
Las Vegas, NV

Newport Lane Water Main Replacement
Results
$278,757 to $340,703 est. value
Reno, NV

Sparks Marina Lake Level Control Pipeline Project
Infrastructure
Results
$815,270 est. value
Sparks, NV

Caughlin 5 Pressure Zone Looping
Infrastructure
Results
$608,850 to $744,150 est. value
Reno, NV

South Virginia 24" Main (Kumle To Peckham)
Alteration
Results
$1,024,650 to $1,252,350 est. value
Reno, NV

Backflow Preventer Replacements at North Las Vegas Airport
Infrastructure
Results
North Las Vegas, NV 89032

Backflow Testing City Wide
Term Contract
Results
North Las Vegas, NV

UNR - Professional Services - Replace Utilities and Pavements in the Thompson-Frandsen Corridor
Infrastructure
Results
$1,250,000 to $1,750,000 est. value
Reno, NV

Last Updated 12/22/2021 02:45 PM
Project Title

Water Service Replacements Fy21-22 Miscellaneous

Physical Address View project details and contacts
City, State (County) Boulder City, NV   (Clark County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes removals of existing 3/4”, 1”, 1-1/2”, and 2” water services, relocation of existing service lines as needed to attain 4’ separation between water and sewer laterals and make the service line perpendicular to the water main, connection to existing or relocated corporation stop at the main with a brass adapter, and installation of new copper water service (size to match existing) from the main to the meter for 36 water services within Boulder City. This work shall also include installation or replacement of water meters, meter boxes, and/or Encoder Receiver Transmitter modules (ERTs) for locations specified (these items will be supplied by the City). This project shall also include asphalt replacements.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents