Installation and Procurement of Boiler Feed Pumps For the Carrollton Water Plant - Boiler Room
Renovation
Design
$300,000 CJ est. value
New Orleans, LA 70118

HVAC Repairs - Gernon Brown Rec Center
Renovation
Design
$300,000 CJ est. value
New Orleans, LA 70124

Full Replacement of the HVAC System at Janet School
Renovation
Sub-Bidding
$500,000 CJ est. value
Marrero, LA 70072

Full Replacement of the HVAC System at Harris Middle School
Renovation
Sub-Bidding
$900,000 CJ est. value
Metairie, LA 70003

East Bank HVAC Maintenance and Repair Services
Term Contract
Post-Bid
LA

West Bank HVAC Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
LA

HVAC system at Meisler Middle School
Alteration
Results
$71,000 est. value
Metairie, LA 70002

HVAC Upgrades of the 100 and 200 buildings at Green Park Elementary School
Alteration
Results
$400,000 est. value
Metairie, LA 70003

Cooling Tower Cleaning
Alteration
Post-Bid
New Orleans, LA

Audubon Aquarium Air Handler Unit Replacements 3.1, 3.10 and 3.13
Renovation
Results
$727,000 CJ est. value
New Orleans, LA 70130

Air Duct Cleaning
Alteration
Post-Bid
New Orleans, LA 70126

Replacement of the Air Handlers at Riverdale High School
Renovation
Results
$2,173,800 CJ est. value
Jefferson, LA 70121

Joe Bartholomew Golf Course 2022 HVAC Service
Alteration
Post-Bid
New Orleans, LA

Mechanical Systems Modification and Upgrades Marine Fisheries Lab Department of Wildlife and Fisheries
Renovation
Results
$447,700 CJ est. value
Grand Isle, LA 70358

HVAC Systems Maintenance and Repair for the Public Works Eastbank Warehouse
Term Contract
Post-Bid
LA

Last Updated 07/20/2023 03:12 PM
Project Title

Labor, Materials and Equipment Necessary to Replace One (1) 3-Ton Liebert Unit at First Parish Court

Physical Address View project details and contacts
City, State (County) Metairie, LA 70003   (Jefferson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $360,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

JEFFERSON PARISH reserves the right to cancel all or any part if not shipped promptly. No charges will be allowed for parking or cartage unless specified in quotation. The order must not be filled at a higher price than quoted. JEFFERSON PARISH reserves the right to cancel any contract at anytime and for any reason by issuing a THIRTY (30) day written notice to the contractor. Contractor must hold current applicable JEFFERSON PARISH licenses with the Department of Inspection and Code Enforcement. Contractor shall obtain any and all permits required by the JEFFERSON PARISH Department of Inspection and Code Enforcement. The contractor shall be responsible for the payment of these permits. All permits must be obtained prior to the start of the project. Contractor must also hold any and all applicable Federal and State licenses. Contractor shall be responsible for the payment of these permits and shall obtain them prior to the start of the project. We extend this proposal to provide labor, materials, equipment, transportation, and all other incidentals necessary to remove and properly dispose of one (1) existing Liebert system and supply and install one (1) new Liebert system at the Jefferson Parish First Parish Courthouse . Install a new 316 stainless steel secondary pan for the new Liebert unit. • Emergency pan shall be three inches deep and shall encompass the entire bottom of the unit. • New Liebert units shall be supported two inches off the emergency pan. • All supports shall have vibration arrestors to prevent excess noise and vibration. • All supports shall be corrosion-resistant. • Supply and install new type L copper condensate primary and secondary drain lines. • Install copper unions for easy access to primary and secondary drain lines. • Install type L copper P-Trap in the primary drain line. • Install overflow shutoff switch on primary and secondary drain lines See attachment “A”. • Overflow shutoff switches shall be wired to the new air handler and shut the system off in case of an overflow or stoppage in the primary or secondary drain lines. Install in-line Cleanout in primary drain lines. • All joints shall be soldered on primary and secondary drain lines. • Run drain lines to the nearest floor drain. • Primary and secondary drain lines shall be supported with a metal framing support system and fasteners. • Both primary and emergency drain lines shall be insulated with a closed cell foam insulation with a minimum wall thickness of ½ inch

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents