Last Updated | 06/29/2023 01:15 PM |
Project Title | Construction of Ft. Bliss Stormwater Diversion Access Structures |
Physical Address | View project details and contacts |
City, State (County) | El Paso, TX 79901 (El Paso County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction Commenced, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $3,589,659 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of June 29 2023 this is in construction. Works to be provided for this project shall be for furnishing all labor, materials, transportation, and services for the construction and installation as follows: Two Access structures along the existing 3 90-inch Reinforced Concrete Pipes consisting of, but not limited to: 1. Insurance, Bonds, and move in related expenses. 2. Right of Way and Site Preparation. 3. Preconstruction and post construction video. 4. Removal of approximately 68 square yards of stabilized base and asphalt pavement. 5. Removal of approximately 3 stormwater manholes. 6. Removal of approximately 150 linear feet of existing 90-inch reinforced concrete stormwater pipe. 7. Excavation and removal from site of approximately 2,897 cubic yards of existing soil. 8. Furnishing and installing compacted in place approximately 1,262 cubic yards of suitable structural fill. 9. Furnishing and installing approximately 5,370 square feet of temporary special shoring for excavation protection. 10. Clean / Remove dirt, rock, sediment from existing 90-inch Reinforced Concrete Stormwater pipes. 11. Furnishing and installing approximately 68 square yards stabilized base and asphalt pavement for pedestrian path. 12. Furnishing and installing complete in place 2 locations of precast-arch-bridge structures including cast in place concrete end-walls, and all components and appurtenances that will serve as the access structure vault. 13. Furnish and install complete in place 2 access ramps consisting of approximately 40 linear feet (Each ramp) of 6'x4' concrete box culvert for the access vault structures including access covers, joint sealants and protective bollards. 14. Furnishing and installing complete in place two sliding gates outside the access vault structures. 15. Furnish and install complete in place 2 bolted stormwater manholes per box on the access structures. 16. Furnish and install complete in place approximately 45 cubic yards of cast in place a reinforced concrete slab foundation as shown on the drawings. 17. Furnish and install complete in place approximately 106 cubic yards of cast in place reinforced concrete footings for end-walls and precast bridge units. 18. Repair Spalls on Reinforced Concrete Pipes. 19. Repair Spalls on Reinforced Concrete Pipes With Partially Exposed Reinforcement Complete in Place. 20. Repair Existing Joints at Reinforced Concrete Pipe Complete in Place. 21. Repair Cracks in Reinforced Concrete Pipe Complete in Place. 22. Furnishing and installing approximately 223 square yards of construction exits. 23. Removing 223 square yards of construction exits at project completion. 24. Furnish and install approximately 440 linear feet temporary sediment control fence. 25. Remove approximately 440 linear feet of temporary sediment control fence. The project description, as shown above, is only a general overview of this project For additional information, submit your inquiry to the Purchasing / Contracts email address: Purchasing.Info@epwater.org. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |