Similar Projects
Signaw River Dredging
Infrastructure
Design
$500,000 CJ est. value
Morton, IL 61733

Renovate and Construct a New Wash Area
New Construction, Renovation, Infrastructure - 9,000 SF
Bidding
$2,000,000 CJ est. value
Morton, IL 61550

Parking Lot and Alley Reconstruction
Infrastructure
Bidding
$200,000 CJ est. value
Pekin, IL 61554

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Panda Express / Pekin
New Construction, Infrastructure - 2,229 SF
Post-Bid
$680,000 CJ est. value
Pekin, IL 61554

Lincoln ES & SHS Site Improvements
Infrastructure
Results
Morton, IL 61550

State Street Paved Ditch - North Pekin
Infrastructure
Results
$80,000 est. value
North Pekin, IL 61554

East Peoria Self Storage / East Peoria
New Construction, Infrastructure - 84,713 SF
Bidding
$9,150,000 CJ est. value
East Peoria, IL 61611

Water System Improvements
Renovation, Infrastructure
Post-Bid
$300,000 CJ est. value
Groveland, IL 61535

Installation of New Traffic Signals, Pavement Markings, ADA Ramp, Curb and Gutter, Riprap, Median Reconstruction
Infrastructure
Results
$649,720 CJ est. value
Pekin, IL 61554

Demolition of Residential Structure
Demolition, Infrastructure
Bidding
$100,000 CJ est. value
Pekin, IL 61554

Construction of the Erie Court Watermain Extension Project
Infrastructure
Post-Bid
$455,000 CJ est. value
Morton, IL 61550

Renovate Courtyard and ADA Improvements Illinois Central College
Infrastructure, Renovation
Results
$3,693,262 CJ est. value
East Peoria, IL 61611

S. Main Street Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Mackinaw, IL 61755

HMA Milling and Overlay; Class D Patches
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Morton, IL 61733

Last Updated 01/05/2024 07:44 AM
Project Title

Montgomery Property Wetland Restoration, Tazewell County, IL

Physical Address View project details and contacts
City, State (County) Delavan, IL 61734   (Tazewell County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate - 12/19/23
Owner View project details and contacts
Architect View project details and contacts
Description

The USDA Farm Producation and Conservation (FPAC) Operations Branch, Acquisition Division issues this solicitation on behalf of USDA Natural Resources Conservation Service (NRCS) for work to enhance degraded wetlands and improve habitat for wetland dependent wildlife on the Montgomery property in Tazewell County, Illinois. In addition, all disturbed areas will be seeded and mulched upon completion of construction. Pursuant to FAR 36.211(b), information regarding USDA's definitization of equitable adjustments for change orders under construction contracts may be found at Contracting with USDA | USDA (can be found under links). USDA's procedures that apply to the definitization of equitable adjustments for change orders under construction contracts may be found in the USDA Contracting Desk Book, located at Policies & Regulations | USDA (can be found under links), under Parts 436 and 443. The work consists of enhancement of degraded wetlands and improve habitat for wetland dependent wildlife per the Statement of Work (SOW). This solicitation is a total small business set-aside. A firm-fixed price construction contract is anticipated to be awarded under Simplified Acquisition Procedures (SAP) in FAR Part 13. In accordance with FAR 36.204, the estimated magnitude of the project is between $25,000 through $100,000. The NAICS code for this solicitation is 237990, Other Heavy and Civil Engineering Construction. The Small Business Standard for this NAICS is $45M. Participants will meet at the Veteran's Memorial Park in Delavan, Illinois 300 E. 4th St. Delavan, IL 61734. Pursuant to FAR 36.211(b), information regarding USDAs definitization of equitable adjustments for change orders under construction contracts may be found at Contracting with USDA | USDA. USDAs procedures that apply to the definitization of equitable adjustments for change orders under construction contracts may be found in the USDA Contracting Desk Book, located at Policies & Regulations | USDA, under Parts 436 and 443. Delivery: 15 Days After Notice to Proceed Delivery Location Code: NRCS-IL-125A12 USDA-NRCS-ILLINOIS STATE OFFICE 2118 WEST PARK COURT CHAMPAIGN IL 61821 US Period of Performance: 02/01/2024 to 03/04/2024 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 12FPC323Q0078

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents