Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Circuit Compressor Replacement on HVAC Chiller Unit
Post-Bid
Richmond, VA

Replace Kitchen Exhaust Hood System
Results
Chesterfield, VA

Fire Restoration Services - Creighton
Results
Richmond, VA

J--Cooling Towers Preventative Maintenance
Post-Bid
Richmond, VA 23249

Baseboard Heaters Installation
Results
Richmond, VA

Rooftop Air Handling Unit Repair at Gordon Elementary School
Post-Bid
VA 23236

JTCC-M Physical Plant Warehouse AC Upgrades
Results
Midlothian, VA

Rooftop Heat Pump Replacements
Post-Bid
Bon Air, Chester, Chesterfield, Richmond, VA 23237

DVS Sitter and Barefoot Veterans Care Center - Chiller Temporary Connection
Results
Richmond, VA 23219

Cooling Tower Replacements
Post-Bid
Chester, VA 23831

HVAC Equipment Replacement Public Safety Training Facility and ECC Building
Results
Chesterfield, VA

Z--Replace HVAC System Project 652-17-102
Post-Bid
$1,000,000 to $2,000,000 est. value
Richmond, VA 23249

Replacement of HVAC Equipment at Carver Middle School
Results
Chester, VA 23831

Modern Green High-Efficiency HVAC System
Post-Bid
Richmond, VA

Reported 01/03/2019 12:00 AM
Project Title

Preventative Maintenance Heating and Cooling Systems

Physical Address View project details and contacts
City, State (County) Richmond, VA   (Chesterfield County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Provide yearly preventative maintenance, annual work and repair/replacement on Heating and Cooling Systems which is comprised of two (2) centrifugal chillers, two (2) cooling towers, AHU's, Hot Water System(s) and Boilers, Liebert(s), and Gas Pack units at the Alcoholic Beverage Control (ABC)'s Central Office located at 2901 Hermitage Road, Richmond VA 23220 1. Isolate chiller water and condenser water flow to both chillers, drain condenser water into appropriate drain. 2. Recover evaporator glycol solution into 55 gallon drums (supplied by vendor) 3. Remove free ends from both condensers and both evaporators 4. Mechanically brush clean condenser tubes and inspect end sheet 5. Inspect evaporator tube sheet for pitting and tube seal integrity 6. Provide eddy current analysis on all four tube bundles (first initial test upon award) 7. Provide new channel gaskets for evaporator heads and reinstal
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents