Similar Projects
Pavement Preservation and Maintenance Services – District 6
Infrastructure
Design
$700,000 CJ est. value
Carrollton, GA 30117

Pavement Preservation and Maintenance Services – District 6
Infrastructure
Design
$700,000 CJ est. value
Carrollton, GA 30117

Lake Carroll Park Phase 2
Infrastructure
Bidding
$200,000 CJ est. value
Carrollton, GA 30117

Lake Carroll Park Phase 2
Infrastructure
Bidding
$200,000 CJ est. value
Carrollton, GA 30117

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Pavement Evaluations for Interstate Maintenance
Alteration
Post-Bid
$25,000 est. value

2021 LMIG Project
Results
Mount Vernon, GA

T32-D6-Ppv-Edge Rut-Carroll-118819
Results
GA

SR 1/US 27 From CR 12/Stephens Road/Polk to Sr 746/Floyd
Infrastructure
Design
$9,000,000 CJ est. value
Bremen, GA 30110

Bus Lane Construction
Infrastructure
Bidding
$80,000 CJ est. value
Villa Rica, GA 30180

The Birches on Maple
New Construction, Infrastructure - 148,000 SF
Post-Bid
$40,000,000 CJ est. value
Carrollton, GA 30117

Lakeshore Recreation - Track Resurfacing Project
New Construction
Results
Carrollton, GA 30117

SR 16 at CS 1110 / Columbia Dr / CS 1120 / Brumbelow Rd
Infrastructure
Design
$2,000,000 CJ est. value
Carrollton, GA 30117

University of West Georgia (UWG) Coliseum Parking Lot Sinkhole Repair
Infrastructure
Post-Bid
$400,000 CJ est. value
Carrollton, GA 30117

Pavement Marking Upgrades
Infrastructure
Results
GA

Last Updated 08/26/2022 08:33 AM
Project Title

New Bus Drive - Bay Springs Middle School

Physical Address View project details and contacts
City, State (County) Villa Rica, GA 30180   (Carroll County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

New Bus Drive - Bay Springs Middle School No proposal may be withdrawn for a period of thirty (30) days after proposals are submitted. B. Proposals shall include: a) the completed Competitive Sealed Proposal Form b) the signed Bid Form c) the Bid Bond d) The "Contractor Affidavit and Agreement" demonstrating compliance with O.C.G.A. 13-10-91, Georgia Security and Immigration Compliance Act and e) affidavits demonstrating compliance with O.C.G.A. 50-36-1, Verification of Lawful Presence Within United states through the use of the Systematic Alien Verification for Entitlements (SAVE) program which are available on the Georgia Audits and Accounts D. Bid bond in the amount of five percent of the base bid is required and must be submitted with the bid. A bid bond is the only acceptable form of bid security. No personal checks, cashier's checks, certified checks or cash will be accepted in lieu of the bid bond. E. Performance and payment bonds in the amount of one-hundred percent (100%) of the contract sum will be required prior to commencement of construction. All bonds shall be written by a surety licensed to conduct business in Georgia, listed on the Federal Register and acceptable to the Owner . Owner reserves the right to waive technicalities and irregularities and to reject any or all proposals.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents