Similar Projects
Wastewater Treatment Plant - Village of Marcellus
Renovation
Conception
$4,400,000 est. value
Marcellus, NY

Water Pollution Control Facility (WPCF) Electrical Upgrades - Phase 5 - E-11 - Town Of Amherst
Renovation
Conception
$750,000 CJ est. value
Buffalo, NY 14228

Brookview Village - Expansion Phase III
Infrastructure
Design
$500,000 to $1,000,000 est. value
Greenfield Center, NY 12833

Municipal Wastewater Treatment Facility Improvements - Village of Patchogue
Renovation
Design
$7,760,000 CJ est. value
E Patchogue, NY 11772

River Road Storage & Mohawk View Water Treatment Plant Mixing Upgrades
Renovation
Bidding
$11,770,205 CJ est. value
Latham, NY 12110

Repair of Boiler at various Wastewater Resource Recovery Facilities, Pump Station(South Region)
Renovation
Bidding
$200,000 CJ est. value
New York, NY 11373

Ultraviolet Disinfection System at Loudonville Reservoir
Infrastructure
Post-Bid
Albany, NY 12211

Bay Park Sewage Treatment Plant Permanent Hot Water/chilled Water Piping System Capital Project
Renovation
Post-Bid
$80,000 CJ est. value
East Rockaway, NY 11518

Red Creek Area WWTP Improvements
New Construction
Results
$500,000 est. value
Red Creek, NY

WWTP Improvements
Renovation
Results
$1,450,000 est. value
Victor, NY 14564

Water Plant Bridge
Infrastructure
Construction
$1,082,280 CJ est. value
Castleton on Hudson, NY 12033

Indian Hills Water System
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Lewisboro, NY 10536

WWTP Upgrade Modified SPDES - City of Kingston
Renovation
Pending Verification
$8,200,000 CJ est. value
Kingston, NY 12402

WPCF HVAC Facility Improvements - Phase 5 - E-13 - Town Of Amherst
Renovation
Conception
$700,000 CJ est. value
Buffalo, NY 14228

Gasport Sewer District 1 Wastewater Disinfection - Town Of Royalton
Renovation, Infrastructure
Design
$650,000 CJ est. value
New York, NY 10036

Last Updated 08/13/2023 11:33 PM
Project Title

Town of Webb UV Disinfection System and Headworks Improvements

Physical Address View project details and contacts
City, State (County) Old Forge, NY 13420   (Herkimer County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $2,929,801 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Owner reserves the right to accept or reject any or all bid items and alternates and to waive any informalities or defects in the bid proposals either before or after opening Contractor shall pay all license fees and royalties and assume all costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of Owner or Engineer, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by Owner in the Contract Documents The recipient, upon written request of the Award Official or an authorized representative of the Department of Labor, shall withhold or cause to withhold from the contractor under this contract or any other federal contract with the same prime contractor, or any other federally-assisted contract subject to Davis-Bacon prevailing wage requirements, which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work, all or part of the wages required by the contract, EPA may, after written notice to the contractor, or recipient take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased. Provide and install a gas detection system complete with remote sensing devices, transmitter, displays, calibration equipment, alarm/horn stations, conduit & wire, control panel, and manufacturers cable as follows and as shown/specified on the Contract Drawings: 1. WWTP Influent Room (3 sensor system with remote alarm light/horn stacks). B. Refer to Contract Drawing Riser Diagrams and Floor Plans for device quantities, equipment tags, and additional information. C. Sensors shall monitor for combustible gas (LEL), hydrogen sulfide (H2S), and oxygen depletion (O2). 1. Range of devices to be as follows: a. LEL: 0-100% LEL b. H2S: 0-50 PPM c. O2: 0-25% D. Provide as-built drawings upon completion of installation. E. Provide two year full replacement warranty on all equipment as part of this specification section. Warranty shall replace, with new (not refurbished) equipment. Warranty duration shall commence on the date of substantial completion. Submit warranty informationg during submittal phase. F. Provide commissioning servics, startup services, and training services. A Bid must be accompanied by Bid security made payable to Owner in an amount of 5 percent of Bidders maximum Bid price (determined by adding the base bid and all alternates) and in the form of cash, a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety authorized to do business in New York State meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions. Simultaneously with his delivery of the executed contract, the successful bidder must deliver to the Owner five (5) originals of an executed bond in the amount of 100% of the accepted bid as security for the faithful performance of the contract and for the payment of all persons performing labor or furnishing materials in connection therewith, prepared in the standard form of Performance Bond (EJCDC Form C-610, 2013 edition), Payment Bond (EJCDC Form C615, 2013 edition) and having as surety thereon such surety company or companies as are acceptable to and approved by the Owner, and as are authorized to transact business in New York State. The bonds must be from a surety company found on the Treasury Circular C-570. Each Bidder must obtain and submit with his Bid the Statement of Surety's Intent attached to the Bid form, completed and signed by a duly authorized surety company licensed to do business in New York State. This requirement will not apply in the case of contracts for supplies only and involving no labor on the site. See Special Conditions for further requirements. Bid-Results:- 1.CONTRACT NO. 1 - GENERAL CONSTRUCTION-C.O. Falter Construction-$2,619,101 2.CONTRACT NO. 2 - Electrical-S.C. Spencer Electric-$310,700

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents