Similar Projects
Construction of Private Water and Private Sanitary Sewer and Public Drainage Facilities to Serve Olympia Falls Section 1
Bidding
TX

Construction of Private Water and Private Sanitary Sewer and Public Drainage Facilities to Serve Olympia Falls Section 1
Bidding
TX

Construction of Grand Mission Regional Detention System Maintenance
Post-Bid
$600,000 est. value
TX

Dry Creek Regional Detention Pond Phase 2
Post-Bid
$844,430 est. value
Rosenberg, TX

Construction of Long Meadow Farms Section 46, Phase 1A Water, Sewer, and Drainage Improvements
Results
TX

Construction of the Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Southern Colony Section 5
Results
Less than $278,500 est. value
TX

Construction of the Water, Sanitary Sewer and Drainage Facilities to Serve Polo Ranch Section 8
Bidding
TX

Water, Sanitary Sewer, Storm Sewer Extensions, and Paving Improvements Serving 42.67 Acre Trac
Post-Bid
TX

Water, Sanitary, Drainage and Paving Facilities in Stonecreek Estates Section 4
Results
TX

Construction of Water, Sanitary, Drainage and Paving for Walnut Creek at Stonecreek Estates Section 1
Bidding
TX

2020 Sanitary Sewer Rehabilitation Project
Post-Bid
Less than $250,000 est. value
Katy, TX 77493

Deer Run Meadows Detention Pond
Results
Less than $1,719,602 est. value
TX

Water, Sanitary Sewer, and Drainage Facilities for Sunset Crossing Bryan Road Phase III
Post-Bid
TX

Water Distribution, Sanitary Sewer and Drainage Facilities to Serve Walnut Creek Section Twenty-Three
Results
TX

Construction of Excavation and Grading in Lakeview Retreat West
Post-Bid
TX

Last Updated 09/22/2020 04:17 PM
Project Title

Water, Sanitary, and Drainage Facilities in Lakeview Retreat Section 8

Physical Address View project details and contacts
City, State (County) TX   (Fort Bend County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents