Similar Projects
CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Design
Fresno, Sequoia National Park, CA

CA NPS PP SEKI 2018(3) CA NPS PP SEKI 2020(1) Pavement Preservation Lassen Seki Phase I and Pavement Preservation Seki Phase II
Term Contract
Design
Fresno, Sequoia National Park, CA

Construct Soldier Pile Retaining Wall, Repair RSP and HMA paving
Infrastructure
Bidding
$16,000,000 est. value
CA

Roadway Excavation, JPCP and Furnish Polyester Concrete Overlay
Infrastructure
Bidding
$22,300,000 est. value
CA

Imola Ave and SR-29 Express Bus Improvements Project
Infrastructure
Post-Bid
$2,600,000 est. value
Napa, CA 94559

Roadway Repairs
Infrastructure
Post-Bid
Cloverdale, Fremont, CA 95425

East Blithedale Rehabilitation Project - Phase I
Alteration
Results
$3,000,000 est. value
Mill Valley, CA

Downtown Rehabilitation Project - Phase II
Alteration
Results
$600,000 to $800,000 est. value
Mill Valley, CA

Province at San Gabriel Condominiums
New Construction, Build-Out, Infrastructure
Construction
$20,000,000 est. value
San Gabriel, CA 91776

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Excavation, HMA, Structural Concrete, Minor Concrete and Drainage
Infrastructure
Bidding
$23,400,000 est. value
CA

Construction Pine Flat Road Repair Project
Infrastructure
Post-Bid
CA

County of Placer - 2021 Roadway Surface Treatments
Alteration
Results
CA

Widen Shoulders and Improve Clear Recovery Zone
Infrastructure
Bidding
$86,000,000 est. value
CA

Smooth Streets Program
Infrastructure
Post-Bid
San Mateo, CA

Last Updated 10/08/2021 03:40 AM
Project Title

Montague Expressway Pavement Rehabilitation Project Between Trimble Road and Highway 880

Physical Address View project details and contacts
City, State (County) San Jose, CA 95154   (Santa Clara County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of: Rehabilitation of the roadway by HMA overlay, pavement repair, roadway excavation, replacement & installation of traffic loops, adjustment of drainage manholes and utilities to grade, removal and replacement of traffic stripes, markings/markers, ADA improvements, removal and replacement of concrete sidewalk, extruding curbs, install new underground conduits, pedestrian sensors, pedestrian push buttons, bicycle loops and logos, relocate electrical cabinets, install battery back up system, detector cards, pullboxes, detector handholes, new wiring, treating bridge deck with methacylate resin, and other details of work not mentioned above that are required by the project plans or these Special Provisions.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents