Similar Projects
Intersection - U.S. Highway 6 and Whiteriver Avenue - City of Rifle
Infrastructure
Conception
$5,000,000 CJ est. value
Rifle, CO 81650

Intersection - U.S. Highway 6 and Whiteriver Avenue - City of Rifle
Infrastructure
Conception
$5,000,000 CJ est. value
Rifle, CO 81650

South Bridge - City of Glenwood Springs
New Construction, Infrastructure
Design
$47,000,000 CJ est. value
Glenwood Springs, CO 81601

South Bridge - City of Glenwood Springs
New Construction, Infrastructure
Design
$47,000,000 CJ est. value
Glenwood Springs, CO 81601

Electric Vehicle Charging Stations Hardware and Software
Infrastructure
Bidding
$130,000 CJ est. value
Glenwood Springs, CO 81601

I-70 Water Main Crossing (2023) project
Infrastructure
Bidding
$300,000 CJ est. value
Silt, CO 81652

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Crystal River Restoration and Weaver Ditch Efficiency Project
Infrastructure
Post-Bid
$150,000 CJ est. value
Carbondale, CO 81623

2022 Chipseal Projects
Infrastructure
Results
$103,221 CJ est. value
Rifle, CO 81650

2022 Chipseal Projects
Infrastructure
Results
$103,221 CJ est. value
Rifle, CO 81650

Glenwood Meadows Multi Residential
New Construction, Infrastructure - 126,672 SF
Construction
$35,000,000 CJ est. value
Glenwood Springs, CO 81601

Mountain View Flats
New Construction, Infrastructure - 40,858 SF
Construction
$8,000,000 CJ est. value
Glenwood Springs, CO 81601

Lakota Canyon Golf Mixed-Use Development / New Castle
New Construction, Infrastructure - 7,000 SF
Pending Verification
$150,000,000 CJ est. value
New Castle, CO 81647

Rifle Apartments
New Construction, Infrastructure - 1,500 SF
Pending Verification
$23,000,000 CJ est. value
Rifle, CO 81650

The Carbondale Town Center Project
New Construction, Infrastructure
Conception
$40,000,000 CJ est. value
Carbondale, CO 81623

Last Updated 10/17/2023 09:16 AM
Project Title

Rifle Gateway and Traffic Improvements Project

Physical Address View project details and contacts
City, State (County) Rifle, CO 81650   (Garfield County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $7,500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PN_ 02372-0004 Reference Number 0000328847 This project entails traffic signal installation at the intersection of Highways 6 and 13 with Whiteriver Avenue. Project includes new concrete sidewalk along 1St Street, East Avenue and Whiteriver Avenue, full depth asphalt removal within the intersection being replaced with concrete pavement, installation of new traffic signal, demolition, and export of materials in the project boundary. Traffic control will be the responsibility of the contractor. Traffic control plans will be required for submittal and approval. The contractor will be required to submit a phasing plan and work with the City and the Project Engineer to determine a plan with the least impact to businesses in the downtown area. Access to businesses shall remain open for the duration of the project. Public Notification will be handled by the City of Rifle, but the awarded contractor should expect to be present in meetings with business owners to communicate the phasing plan prior to beginning work. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % A Bid Bond in the amount of 5% of bid price is required, and a Performance and a Payment Bond, each in the amount of 100% of bid, will also be required. Job Location Rifle, CO Question Acceptance Deadline 09/15/2023 at 12:00 PM MT Questions are submitted online No Contact Craig Spaulding, cspaulding@rifleco.org, 970-665-6556 for questions or issues with downloading the documentation. Bid Award will be at the October 18, 2023, Council Meeting. Time of Commencement of the Work is anticipated to be no later than March 18, 2024, with construction completion by July 19, 2024

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents